Tuas Crescent MRT Station – Construction progress (June 2016)

Tuas Crescent MRT Station - Construction progress (June 2016). The station and tracks are built above the elevated road viaduct

Tuas Crescent MRT Station – Construction progress (June 2016). The station and tracks are built above the elevated road viaduct

Tuas Crescent MRT Station – Construction progress (June 2016). The station and tracks are built above the elevated road viaduct

Leave a Reply

Your email address will not be published. Required fields are marked *