BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20160101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20171120
DTEND;VALUE=DATE:20180430
DTSTAMP:20260408T123524
CREATED:20171207T063702Z
LAST-MODIFIED:20180424T050454Z
UID:49195-1511143200-1524967199@landtransportguru.net
SUMMARY:No Train Service between Joo Koon and Gul Circle
DESCRIPTION:To enable engineers to carry out further assurance checks on the new signalling system\, train services between EW29 Joo Koon and EW30 Gul Circle have been suspended since Monday\, 20 November 2017. \nA Free Shuttle Bus Service between Joo Koon and Gul Circle is provided for affected commuters to continue their journey. \nHowever\, train services between Tuas Link and Gul Circle continue to operate as per normal. \nTrain Service between Joo Koon & Gul Circle will resume on Sundays from 29 April 2018 to 27 May 2018 as part of the East West Line Signalling System Trial.
URL:https://landtransportguru.net/event/no-train-service-between-joo-koon-and-gul-circle/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/12/Joo-Koon-Gul-Circle-Shuttle-Bus-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20171217
DTEND;VALUE=DATE:20171218
DTSTAMP:20260408T123524
CREATED:20171207T065622Z
LAST-MODIFIED:20200323T142641Z
UID:49233-1513476000-1513555199@landtransportguru.net
SUMMARY:MRT Closure: Tiong Bahru - Tuas Link\, Choa Chu Kang - Jurong East (17 Dec)
DESCRIPTION:To facilitate additional engineering hours for re-signalling and maintenance work\, there will be no train services between Tiong Bahru & Tuas Link on the East West Line as well as Jurong East & Choa Chu Kang on the North South Line on the following Sundays: 10 & 17 December. \nShuttle Bus Services will be available from Outram Park to Tuas Link and Jurong East to Choa Chu Kang. \nFind out more at Shortened Operating Hours on East West & North South Lines (Dec 2017) \n\nShuttle Bus Services\n4 Shuttle Bus Services will be provided for the affected stations during the affected days. \nFares will be payable for the Shuttle Bus Services\, equivalent to the distance travelled by train. \nClick on the respective shuttle service for more information on the Shuttle Service. \n\n\n\nService\nRoute\nMRT Stations Served\n\n\n\nShuttle 1\nOutram Park ↔ Jurong East\nOutram Park\, Tiong Bahru\, Redhill\, Queenstown\,\nCommonwealth\, Buona Vista\, Dover\, Clementi\, Jurong East\n\n\nShuttle 2\nJurong East ↔ Joo Koon\nJurong East\, Chinese Garden\, Lakeside\, Boon Lay\, Pioneer\, Joo Koon\n\n\nShuttle 3\nTuas Link ↔ Joo Koon\nTuas Link\, Tuas West Road\, Tuas Crescent\, Gul Circle\, Joo Koon\n\n\nShuttle 4\nJurong East ↔ Choa Chu Kang\nJurong East\, Bukit Batok\, Bukit Gombak\, Choa Chu Kang\n\n\n\nDuring the period of operation for Shuttle Service 3 (Tuas Link ↔ Joo Koon)\, the Free Shuttle Bus Service between Joo Koon & Gul Circle stations will not operate.
URL:https://landtransportguru.net/event/mrt-closure-tiong-bahru-tuas-link-choa-chu-kang-jurong-east-17-dec/
CATEGORIES:Train Service Changes,Train Service Disruptions
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20171217
DTEND;VALUE=DATE:20171219
DTSTAMP:20260408T123524
CREATED:20171209T040015Z
LAST-MODIFIED:20171212T134917Z
UID:49448-1513476000-1513573199@landtransportguru.net
SUMMARY:11 SMRT Bus Services to be Wheelchair Accessible
DESCRIPTION:SMRT WAB Services from 17 Dec 2017\nFrom Sunday\, 17 December 2017\, the following SMRT Bus Services will be wheelchair accessible: \n\nSMRT Bus Service 184\nSMRT Feeder Bus Service 300\nSMRT Feeder Bus Service 900\nSMRT Bus Service 964\nSMRT NightRider NR1\nSMRT NightRider NR2\nSMRT NightRider NR3\nSMRT NightRider NR5\nSMRT NightRider NR6\nSMRT NightRider NR7\nSMRT NightRider NR8\n\nAs such\, all SMRT Bus Services will be Wheelchair-Accessible from 17 Dec 2017.
URL:https://landtransportguru.net/event/11-new-smrt-wab-dec-17/
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20171217T050000
DTEND;TZID=Asia/Shanghai:20171217T070000
DTSTAMP:20260408T123524
CREATED:20171207T062937Z
LAST-MODIFIED:20171207T065753Z
UID:49188-1513486800-1513494000@landtransportguru.net
SUMMARY:Late Opening of Bukit Panjang LRT (17 Dec)
DESCRIPTION:Train services will start at 7:00am to facilitate more time for engineering staff to expedite the renewal of ageing track infrastructure such as rail mounting frames and rail expansion joints on the BPLRT network. \nTemporary rail replacement services (LRT Shuttle Bus Services) serving the entire Bukit Panjang LRT network will be operating across Sunday mornings from 12 November 2017 to 31 December 2017 to facilitate later Bukit Panjang LRT train service commencement times. \nFind out more at Bukit Panjang LRT Shuttle Bus Service (Nov – Dec 2017).
URL:https://landtransportguru.net/event/late-opening-of-bukit-panjang-lrt-17-dec/
CATEGORIES:Train Service Disruptions
END:VEVENT
END:VCALENDAR