BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20160101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20171120
DTEND;VALUE=DATE:20180430
DTSTAMP:20260408T071312
CREATED:20171207T063702Z
LAST-MODIFIED:20180424T050454Z
UID:49195-1511143200-1524967199@landtransportguru.net
SUMMARY:No Train Service between Joo Koon and Gul Circle
DESCRIPTION:To enable engineers to carry out further assurance checks on the new signalling system\, train services between EW29 Joo Koon and EW30 Gul Circle have been suspended since Monday\, 20 November 2017. \nA Free Shuttle Bus Service between Joo Koon and Gul Circle is provided for affected commuters to continue their journey. \nHowever\, train services between Tuas Link and Gul Circle continue to operate as per normal. \nTrain Service between Joo Koon & Gul Circle will resume on Sundays from 29 April 2018 to 27 May 2018 as part of the East West Line Signalling System Trial.
URL:https://landtransportguru.net/event/no-train-service-between-joo-koon-and-gul-circle/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/12/Joo-Koon-Gul-Circle-Shuttle-Bus-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20180309T230000
DTEND;TZID=Asia/Shanghai:20180311T080000
DTSTAMP:20260408T071312
CREATED:20180225T000116Z
LAST-MODIFIED:20200323T142618Z
UID:52532-1520636400-1520755200@landtransportguru.net
SUMMARY:East West Line MRT Early Closure & Late Opening (09 - 11 Mar)
DESCRIPTION:Shorter operating hours along the entire East West Line (EWL) will take effect on selected days of March 2018 (and 01 April 2018) to facilitate additional engineering hours for re-signalling and maintenance work. This will involve early closures and late openings\, along the EWL. \n  \n\n			\n				\n			\n				\n				EWL Shortened Operating Hours (March 2018)\n				\n			\n				\n			\n		\n\nTrain services between Pasir Ris – Tuas Link as well as Tanah Merah – Changi Airport on the East West Line will: \n\nEnd Earlier at 11pm (Last Trains from Joo Koon & Pasir Ris at 10.30pm)\non Friday\, 09 Mar 2018 & Saturday\, 10 Mar 2018\nStart Later at 8am\non Saturday\, 10 Mar 2018 & Sunday\, 11 Mar 2018\n\nFind out more (including affected train timings) at Shortened Operating Hours on East West Line (Mar 2018) \nShuttle Bus Services will be available as below. \n\nShuttle Bus Services\n10 Shuttle Bus Services will be provided for the affected stations during the affected days. \nFares will be payable for the Shuttle Bus Services\, equivalent to the distance travelled by train. \nClick on the respective shuttle service for more information on the Shuttle Service. \n\n\n\nService\nRoute\n\n\nShuttle 1\nBuona Vista ↔ Raffles Place\n\n\nShuttle 2\nJoo Koon ↔ Buona Vista\n\n\nShuttle 3\nTuas Link ↔ Joo Koon\n\n\nExpress 5\nBoon Lay ↔ Outram Park\n*(On Saturday & Sunday mornings only)\n\n\nShuttle 6\nRaffles Place ↔ Paya Lebar\n\n\nShuttle 7\nPaya Lebar ↔ Pasir Ris\n\n\nShuttle 8\nTanah Merah ↔ Changi Airport\n\n\nExpress 12\nChangi Airport ↔ Bugis\n\n\nExpress 13\nBedok ↔ Bedok North\n\n\nExpress 15\nClementi ↔ Beauty World
URL:https://landtransportguru.net/event/eclo-mar18-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/01/Aljunied-MRT-ECLO-Jan18.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180310
DTEND;VALUE=DATE:20180312
DTSTAMP:20260408T071312
CREATED:20180213T000026Z
LAST-MODIFIED:20180301T062303Z
UID:51931-1520647200-1520744399@landtransportguru.net
SUMMARY:Relocation of New Bridge Road Bus Terminal to Kampong Bahru Bus Terminal
DESCRIPTION:On Saturday\, 10 March 2018\, Bus Services at New Bridge Road Bus Terminal will be relocated to Kampong Bahru Bus Terminal. \nThese bus services are as follows: \n\n\n\nService\nDestination\n\n\n2\nChangi Village\n\n\n12\nPasir Ris\n\n\n12e\nPasir Ris\n\n\n54\nBishan\n\n\n120\nTelok Blangah Heights (Loop)\n\n\n121\nTelok Blangah Rise (Loop)\n\n\n122\nCommonwealth Drive (Loop)\n\n\n174\nBoon Lay\n\n\n174e\nBoon Lay\n\n\n190\nChoa Chu Kang\n\n\nCT8\nAng Mo Kio Avenue 9\n\n\nCT18\nBedok North Avenue 3\n\n\n\n  \n\nBackground\nIn May 2016\, it was announced that New Bridge Road Bus Terminal was to be relocated to a plot of state land next to Blair Road which was formerly owned by Malayan Railways. The relocated bus terminal\, Kampong Bahru Bus Terminal\, can be accessed by an extension of Spooner Road via Kampong Bahru Road. \nThe existing plot of land that New Bridge Road Bus Terminal occupies will be cleared to build an Elective Care Centre\, an expansion of existing infrastructure at Singapore General Hospital. This new Elective Care Centre is scheduled to be ready by 2022. \n\nBus Service Amendments\nBus Services 2\, 12\, 54\, 121\, 122\, 174 & 190 will call an additional bus stop from Kampong Bahru Bus Terminal\, as well as 2 additional bus stops towards Kampong Bahru Bus Terminal. \nBus Services 12e\, 174e\, CT8 & CT18 will only call at an additional bus stop towards Kampong Bahru Bus Terminal. \n\n\n\nAdditional Bus Stops Served – Towards Kampong Bahru Bus Terminal\n\n\nBus Stop Code\nRoad Name\nBus Stop Name\nBus Services\n\n\n10011\nNew Bridge Rd\nBef Neil Rd\n2\, 12\, 12e\, 54\, 121\, 122\, 174\, 174e\, 190\, CT8\, CT18\n\n\n10041\nKampong Bahru Rd\nBef Kg Bahru Ter\n2\, 12\, 54\, 121\, 122\, 174\, 190\n\n\n10499\nSpooner Rd\nKg Bahru Ter\n2\, 12\, 12e\, 54\, 120\, 121\, 122\, 174\, 174e\, 190\, CT8\, CT18\n\n\nAdditional Bus Stops Served – From Kampong Bahru Bus Terminal\n\n\nBus Stop Code\nRoad Name\nBus Stop Name\nBus Services\n\n\n10499\nSpooner Rd\nKg Bahru Ter\n2\, 12\, 12e\, 54\, 120\, 121\, 122\, 174\, 174e\, 190\, CT8\, CT18\n\n\n10049\nKampong Bahru Rd\nOpp Kg Bahru Ter\n2\, 12\, 54\, 121\, 122\, 174\, 190\n\n\n\nBus Service 120\nBus Service 120 will be shortened to Kampong Bahru Bus Terminal\, skipping bus stops along Kampong Bahru Road\, Eu Tong Sen St & Blair Road. The first stop after and last stop before Kampong Bahru Bus Terminal will be Bus Stop 10051 – Blk 149\, Jln Bukit Merah and Bus Stop 10059 – Opp Blk 149\, Jln Bukit Merah respectively. \n\n\n\nBus Stops Skipped – Bus Service 120\n\n\nBus Stop Code\nRoad Name\nBus Stop Name\n\n\n10049\nKg Bahru Rd\nAft Jln Bt Merah\n\n\n10589\nEu Tong Sen St\nNew Bridge Rd Ter\n\n\n10017\nEu Tong Sen St\nAft Hosp Dr\n\n\n10021\nNeil Rd\nBlk 3\n\n\n10041\nKg Bahru Rd\nAft Blair Rd\n\n\n\n\nPosters\n\n			\n				\n			\n				\n				Relocation of New Bridge Road Bus Terminal to Kampong Bahru Bus Terminal – SBS Transit Poster\n				\n			\n				\n			\n				\n				Kampong Bahru Bus Terminal SBS Transit Guide (Front)\n				\n			\n				\n			\n				\n				Kampong Bahru Bus Terminal SBS Transit Guide (Back)\n				\n			\n				\n			\n				\n				Kampong Bahru Bus Terminal Poster for Bus Services 54\, 120\, 121\, 122\, 174\, 174e\, CT8 & CT18\n				\n			\n				\n			\n				\n				Route Extension to Kampong Bahru Ter Poster for Bus Services 2\, 12 & 12e\n				\n			\n				\n			\n				\n				Route Amendment to Kampong Bahru Bus Terminal – Service 120 Poster\n				\n			\n				\n			\n				\n				Route Extension to Kampong Bahru Bus Terminal – Service 190 Poster\n				\n		\n\n\n\nReferences\n\nLTA Press Release\nSBS Transit Press Release\nSMRT Buses Press Release\nGo-Ahead Singapore Press Release
URL:https://landtransportguru.net/event/relocation-of-new-bridge-road-bus-terminal-to-kampong-bahru-bus-terminal/
LOCATION:Kampong Bahru Bus Terminal\, 11A Spooner Road\, Singapore
CATEGORIES:Bus Service Changes
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/02/Kampong-Bahru-Bus-Terminal-Feb18-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180310
DTEND;VALUE=DATE:20180312
DTSTAMP:20260408T071312
CREATED:20180301T070013Z
LAST-MODIFIED:20180301T070304Z
UID:52668-1520647200-1520744399@landtransportguru.net
SUMMARY:Amendment of Bus Service 61 towards Eunos to Commonwealth MRT Station
DESCRIPTION:Due to the permanent closure of one section of Tanglin Halt Road\, Bus Service 61 towards Eunos will be amended to ply Commonwealth Ave\, serving Commonwealth MRT Station at both sides of the road. \nRoute Amendment due to closure of Tanglin Halt Road – Service 61 Poster
URL:https://landtransportguru.net/event/route-amendment-sv61-2018/
CATEGORIES:Bus Service Changes
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/09/5043-61.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180311
DTEND;VALUE=DATE:20180313
DTSTAMP:20260408T071312
CREATED:20180128T150000Z
LAST-MODIFIED:20180310T084743Z
UID:51319-1520733600-1520830799@landtransportguru.net
SUMMARY:Transitioning to Seletar Bus Package (Tranche 1)
DESCRIPTION:Fourteen (14) existing SBS Transit Bus Services under the Seletar Bus Package (Negotiated Contract) will be transferred to the Seletar Bus Package (Tendered Contract) on Sunday\, 11 March 2018. \nThe Seletar Bus Package\, comprising 26 bus services and awarded to SBS Transit\, will undergo 3-tranche transition period where SBS Transit assumes control of all bus routes. Tranche 1 (14 routes) includes all existing SBS Transit bus routes\, whereas Tranche 2 and 3 (12 routes) are for existing SMRT bus routes. \nThe 14 SBS Transit Bus Services under Tranche 1 are as follows: \n\n\n\nService\nDestination 1\nDestination 2\nType\nDescription\n\n\n24\nAng Mo Kio\n↺ Changi Airport\nTrunk\n\n\n\n70\nYio Chu Kang\nShenton Way\nTrunk\n\n\n\n70M\nYio Chu Kang\n↺ Temasek Ave\nTrunk\nSupplementary route\n\n\n71\nYio Chu Kang\n↺ Bishan St 11\nTrunk\n\n\n\n76\nYio Chu Kang\nEunos\nTrunk\n\n\n\n130\nAng Mo Kio\nShenton Way\nTrunk\n\n\n\n133\nAng Mo Kio\nShenton Way\nTrunk\n\n\n\n135\nAng Mo Kio\n↺ Siglap Link\nTrunk\n\n\n\n138\nAng Mo Kio\n↺ Mandai Lake Rd\nTrunk\n\n\n\n162\nYio Chu Kang\nShenton Way\nTrunk\n\n\n\n162M\nYio Chu Kang\n↺ Temasek Ave\nTrunk\nSupplementary route\n\n\n261\nAng Mo Kio\n↺ Ang Mo Kio Ind Park 1\nFeeder\n\n\n\n262\nAng Mo Kio\n↺ Ang Mo Kio Ave 2\nFeeder\n\n\n\n265\nAng Mo Kio Depot\n↺ Ang Mo Kio Ave 10\nTownlink\n\n\n\n268\nAng Mo Kio Depot\n↺ Ang Mo Kio Ind Pk 2\nTownlink\n\n\n\n269\nAng Mo Kio\n↺ Ang Mo Kio St 61\nFeeder\n\n\n\n\nOriginally\, the transitioning of the Seletar Bus Package was intended to have 5 tranches. This was reduced to 3 tranches when incumbent operator SBS Transit was awarded the contract. \nFor commuters\, the switch from the Negotiated Contract to the Tendered Contract will have minimal impact on their commuting patterns\, especially since the operators and bus fleets stay the same. However\, with increased emphasis on specified EWT performance standards\, bus drivers may be made to slow down to regulate the headway between buses. \nShort Trip Service 265A will also be withdrawn from 12 March 2018\, as part of the Seletar Bus Package transitioning. SBS Transit will operate additional trips to Bus Service 265 instead. \nSBS Transit Seletar Bus Package Takeover Poster\nMain Article: Transitioning to Seletar Bus Package \nSee Also:\n\nTransitioning to Seletar Bus Package (Tranche 2) – 18 Mar 2018\nTransitioning to Seletar Bus Package (Tranche 3) – 25 Mar 2018
URL:https://landtransportguru.net/event/transitioning-to-seletar-bus-package-tranche-1/
CATEGORIES:Events
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/12/2017-71-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20180311T050000
DTEND;TZID=Asia/Shanghai:20180311T070000
DTSTAMP:20260408T071312
CREATED:20180223T000133Z
LAST-MODIFIED:20180223T020352Z
UID:52442-1520744400-1520751600@landtransportguru.net
SUMMARY:Sengkang LRT Maintenance Works (11 Mar)
DESCRIPTION:To facilitate maintenance works on the Sengkang LRT & Punggol LRT network\, Train Services will only commence at 7:00am on Sunday\, 11 March 2018 for the following LRT Services: \n\nSengkang East LRT via Compassvale (East Loop Outer\, Service A)\nSengkang West LRT via Cheng Lim (West Loop Inner\, Service C)\n\nSengkang East LRT Services will only operate via Ranggung (East Loop Inner\, Service B) until 7:00am\, when Service B resumes.\nSengkang West LRT Services will only operate via Renjong (West Loop Outer\, Service D) until 7:00am\, when Service D resumes. \n  \nMaintenance Works Poster for Sengkang & Punggol LRT in Mar & Apr 2018\n 
URL:https://landtransportguru.net/event/splrt-maintenance-works-11mar18/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/05/SPLRT_Stock-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20180311T053000
DTEND;TZID=Asia/Shanghai:20180311T100000
DTSTAMP:20260408T071312
CREATED:20180306T000041Z
LAST-MODIFIED:20180306T132612Z
UID:52861-1520746200-1520762400@landtransportguru.net
SUMMARY:MetaSprint Series Singapore\, Duathlon 2018 Bus Diversions
DESCRIPTION:SBS Transit Bus Diversion Poster for MetaSprint Series Singapore\, Duathlon 2018
URL:https://landtransportguru.net/event/metasprint-series-singapore-duathlon-2018-bus-diversions/
CATEGORIES:Bus Service Diversions
END:VEVENT
END:VCALENDAR