BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20170101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20180928T230000
DTEND;TZID=Asia/Shanghai:20180930T080000
DTSTAMP:20260407T185914
CREATED:20180719T030615Z
LAST-MODIFIED:20200323T142106Z
UID:58007-1538175600-1538294400@landtransportguru.net
SUMMARY:MRT Early Closure & Late Opening: Dover – Pioneer & Jurong East – Bukit Gombak (28 - 30 Sep)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Bukit Gombak and Jurong East\, as well as along the East West Line (EWL) between Dover and Pioneer will take place on selected days of August & September 2018 to facilitate additional engineering hours for track maintenance and renewal works along the affected sectors. This will involve early closures and late openings along the NSL and EWL. \nAffected Train Stations\n\nEW22 Dover\nEW23 Clementi\nEW24NS1 Jurong East\nEW25 Chinese Garden\nEW26 Lakeside\nEW27 Boon Lay\nEW28 Pioneer\nNS2 Bukit Batok\nNS3 Bukit Gombak\n\nTrain services between Jurong East – Choa Chu Kang on the North South Line & Buona Vista – Joo Koon on the East West Line will: \n\nend Earlier at around 11pm on Friday\, 28 September 2018 & Saturday\, 29 September 2018\nstart Later at around 8am on Saturday\, 29 September 2018 & Sunday\, 30 September 2018\n\nFind out more (including affected train timings) at Early Closure\, Late Opening of North South & East West Line (August & September 2018) \nShuttle Bus Services will be available: \n\nShuttle 2: Joo Koon—Buona Vista\nShuttle 4: Jurong East—Choa Chu Kang\nExpress 5: Boon Lay—Buona Vista (via Jurong East only) [Saturday & Sunday morning only]\n\nOperating hours for selected Bus Services from Clementi\, Jurong East\, Boon Lay & Choa Chu Kang Bus Interchanges will also be extended on: \n\nFriday\, 28 September 2018 & Saturday\, 29 September 2018\n\n\n 
URL:https://landtransportguru.net/event/eclo-augsep18-6/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/02/Jurong-East-tracks.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180929
DTEND;VALUE=DATE:20181001
DTSTAMP:20260407T185914
CREATED:20180907T130502Z
LAST-MODIFIED:20180907T151412Z
UID:59735-1538186400-1538272799@landtransportguru.net
SUMMARY:Commencement of Bi-Directional Punggol West LRT Service
DESCRIPTION:From Saturday\, 29 September 2018\, Punggol West LRT will operate as a bi-directional service daily. \nSBS Transit Poster for Bi-Directional Punggol West LRT Service\nPreviously\, owing to low demand\, the Inner Loop (via Sam Kee\, Soo Teck) would operate until 3:00pm\, after which the West Loop would be served by the Outer Loop (via Soo Teck\, Sam Kee) until the end of service. \n\nLRT Train Service Enhancement\nTo further keep pace with developments in these areas\, SBS Transit will enhance LRT services for the Punggol East\, Sengkang West and Sengkang East Loops by injecting an additional single-car train\, or by running a two-car train instead of a single-car train at selected times of the day. The increased capacity enables the SPLRT to better serve the growing ridership in Sengkang and Punggol. \n  \n\nReferences\n\nJoint News Release by the Land Transport Authority (LTA) & SBS Transit – Bi-Directional LRT Services on Punggol West Loop to Begin from 29 September 2018 – LTA\n\n 
URL:https://landtransportguru.net/event/commencement-of-bi-directional-punggol-west-lrt-service/
CATEGORIES:Train Service Changes
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/05/SPLRT_Stock-1.jpg
END:VEVENT
END:VCALENDAR