BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20180101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20190831T053000
DTEND;TZID=Asia/Shanghai:20190901T083000
DTSTAMP:20260408T183452
CREATED:20190813T063123Z
LAST-MODIFIED:20200323T141920Z
UID:72885-1567229400-1567326600@landtransportguru.net
SUMMARY:MRT Late Opening: Jurong East – Woodlands (31 Aug – 1 Sep)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Jurong East and Woodlands will take place on selected Saturdays & Sundays in August & September 2019 to facilitate additional engineering hours for power supply system renewal and maintenance works. \nThis will involve late openings along the NSL \n\n			\n				\n			\n				\n				North South Line – Early Closure & Late Opening (Aug & Sep 2019)\n				\n		\n\nAffected Train Stations\n\nNS1EW24 Jurong East\nNS2 Bukit Batok \nNS3 Bukit Gombak\nNS4BP1 Choa Chu Kang\nNS5 Yew Tee\nNS7 Kranji\nNS8 Marsiling\nNS9 Woodlands\n\nTrain services between Jurong East – Woodlands on the North South Line will: \n\nStart later at around 8.00am on Saturday\, 31 August 2019 & Sunday\, 1 September 2019.\n\n\nFind out more (including affected train timings) at Early Closure\, Late Opening of North South Line (August & September 2019) \nTrain Service will only operate between NS9 Woodlands and NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 4: Jurong East—Woodlands\n\n 
URL:https://landtransportguru.net/event/lo-aug19-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/12/5760-Shuttle-4.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20190901T053000
DTEND;TZID=Asia/Shanghai:20190901T173000
DTSTAMP:20260408T183452
CREATED:20190607T011148Z
LAST-MODIFIED:20190614T011347Z
UID:70788-1567315800-1567359000@landtransportguru.net
SUMMARY:Sengkang LRT Maintenance Works (September 2019)
DESCRIPTION:Maintenance works on Sengkang LRT | Sunday\, 1st September 2019\n\n\nTrain Service Operates:\nEast Loop\nWest Loop\n\n\nBefore 1730hrs\nInner Loop (via SE5 Ranggung)\nOuter Loop (via SW8 Renjong)\n\n\nAfter 1730hrs\nBoth Directions\nBoth Directions\n\n\n\nTo facilitate asset renewal and maintenance works on the Sengkang LRT network\, Train Services will only commence at 5:30 pm on Sunday\, 1 September 2019 for the following LRT Services: \n\nSengkang West LRT  via SW1 Cheng Lim\n(West Loop Inner / Route B)\nSengkang East LRT  via SE1 Compassvale\n(East Loop Outer / Route C)\n\n\nSengkang LRT Services will only operate via: \n\nSW8 Renjong on the  West Loop \n(West Loop Outer / Route A)\nSE5  Ranggung on the East Loop  and;\n(East Loop Inner / Route D)\n\nuntil 5:30 pm\, when normal LRT services resume on both loops. \nMain Article: Sengkang LRT Maintenance Works (June – October 2019) \n\nOperator Poster\n\n			\n				\n			\n				\n				Sengkang LRT Maintenance Works (June – October 2019)\n				\n		\n\n 
URL:https://landtransportguru.net/event/sklrt-maintenance-q3-2019-11/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/09/SPLRT_Stock-2.jpg
END:VEVENT
END:VCALENDAR