BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20220827
DTEND;VALUE=DATE:20220830
DTSTAMP:20260408T034924
CREATED:20220516T011423Z
LAST-MODIFIED:20220517T143936Z
UID:109694-1661565600-1661738399@landtransportguru.net
SUMMARY:Punggol LRT Maintenance Works (27 - 28 Aug)
DESCRIPTION:Maintenance works on Punggol LRT\nSaturday\, 27 August 2022 &\nSunday\, 28 August 2022\n\n\n\nTrain Service\n\nEast Loop\nWest Loop\n\n\nSuspended\nOuter Loop (via PE7 Damai)\nInner Loop (via PW1 Sam Kee)\n\n\nIn Operation\nInner Loop (via PE1 Cove)\nOuter Loop (via PW7 Soo Teck)\n\n\n\nTo facilitate extended engineering hours for maintenance works on the LRT guideways\, Train Service will be suspended for the following LRT Services (from Punggol Town Centre station): \n\nPunggol West LRT via PW1 Sam Kee\n(West Loop Inner / Route B)\n\nPunggol East LRT via PE7 Damai\n(East Loop Outer / Route C)\n\n\nPunggol LRT Service will only operate via (from Punggol Town Centre station): \n\nPunggol West LRT via PW7 Soo Teck\n(West Loop Outer / Route A)\n Punggol East LRT via PE1 Cove\n(East Loop Inner / Route D)\n\non Saturday\, 27 August 2022 & Sunday\, 28 August 2022.\n \nMain Article: Sengkang & Punggol LRT Maintenance Works (May – September 2022) \n\nOperator Poster\n\n			\n				\n			\n				\n				Punggol LRT Maintenance Works (May – September 2022)
URL:https://landtransportguru.net/event/pglrt-maintenance-q2-2022-7/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/07/pglrt_pe4_mar16-4.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20220828
DTEND;VALUE=DATE:20220830
DTSTAMP:20260408T034924
CREATED:20220728T130013Z
LAST-MODIFIED:20220729T024059Z
UID:111323-1661652000-1661738399@landtransportguru.net
SUMMARY:Route Amendment for Partial Closure of Hougang Central
DESCRIPTION:From Sunday\, 28 August 2022\, the routes of bus services 27\, 80\, 80A\, 87\, 89\, 89e\, 107\, 107M & 161 will be temporarily amended due to the partial closure of Hougang Central to facilitate the construction of Hougang MRT station on the Cross Island MRT Line. \n\nBus Services 27\, 80\, 80A\, 87\, 89\, 89e & 161 will be amended to ply Hougang Ave 4\, serving a pair of additional bus stops along Hougang Ave 10\nBus Services 107 & 107M will be amended to ply Hougang Ave 4\, serving at a pair of additional bus stops along Hougang Central\, as well as Hougang Ave 4 while skipping a pair of bus stops along Hougang Ave 10\n\nIn addition\, morning peak departure timings for Express 89e from Hougang Central Int will be amended from 29 Aug 2022. \n\nOperator Posters\n\n			\n				\n			\n				\n				SBS Transit Poster for Services 27\, 80\, 87\, 89\, 89e & 161 Route Amendment\n				\n			\n				\n			\n				\n				SBS Transit Poster for Service 107 / 107M Route Amendment
URL:https://landtransportguru.net/event/route-amendment-partial-closure-hougang-central/
CATEGORIES:Bus Service Changes
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/06/6104_80A-1.jpg
END:VEVENT
END:VCALENDAR