BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20220924
DTEND;VALUE=DATE:20220927
DTSTAMP:20260408T021023
CREATED:20220516T011845Z
LAST-MODIFIED:20220923T085639Z
UID:109696-1663984800-1664157599@landtransportguru.net
SUMMARY:Sengkang LRT Maintenance Works (24 – 25 Sep)
DESCRIPTION:[Updated on 23 September 2022 with latest information from SBS Transit] \n\n\n\nMaintenance works on Sengkang LRT\nSaturday\, 24 September 2022 &\nSunday\, 25 September 2022\n\n\n\nTrain Service\n\nEast Loop\nWest Loop\n\n\nSuspended\nInner Loop (via SE5 Ranggung)\nOuter Loop (via SW8 Renjong)\n\n\nIn Operation\nOuter Loop (via SE1 Compassvale)\nInner Loop (via SW1 Cheng Lim)\n\n\n\nTo facilitate extended engineering hours for maintenance works on the LRT guideways\, Train Service will be suspended for the following LRT Services (from Sengkang Town Centre station): \n\nSengkang West LRT via SW8 Renjong\n(West Loop Outer / Route A)\n\nSengkang East LRT via SE5 Ranggung\n(East Loop Inner / Route D)\n\n\nSengkang LRT Service will only operate via (from Sengkang Town Centre station): \n\nSengkang West LRT via SW1 Cheng Lim\n(West Loop Inner / Route B)\n\nSengkang East LRT via SE1 Compassvale\n(East Loop Outer / Route C)\n\n\non Saturday\, 24 September 2022 & Sunday\, 25 September 2022. \nMain Article: Sengkang & Punggol LRT Maintenance Works (May – September 2022) \n\nChange of Work Schedule\nMaintenance work was originally planned to be carried out on the Punggol LRT (east loop via Damai & west loop via Sam Kee) on the above dates. However\, SBS Transit posted a notice on their social media channels on 23 September 2022 to change the maintenance work schedule from Punggol LRT to Sengkang LRT. \nReference:\n\nSBS Transit Twitter\n\n  \n 
URL:https://landtransportguru.net/event/pglrt-maintenance-q2-2022-9/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/07/pglrt_pe5_mar16-1.jpg
END:VEVENT
END:VCALENDAR