BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20240517
DTEND;VALUE=DATE:20270102
DTSTAMP:20260406T062010
CREATED:20240515T120007Z
LAST-MODIFIED:20251107T040940Z
UID:128335-1715911200-1798768799@landtransportguru.net
SUMMARY:Bus Service Diversion for Early Closure of Jurong West Avenue 4 for JRL Works
DESCRIPTION:To facilitate construction works near the Jurong Region Line Bahar Junction station\, a section of Jurong West Avenue 4 will be closed at 11:00pm daily from 17 May 2024 to 31 December 2026. \nOriginally planned to end after 15 October 2024\, the extended arrangement till 31 October 2025 was announced by the contractor of Contract J105 on 16 Sep 2024 to facilitate structural and roofing works for the JRL station. \nOn 30 September 2025\, the contractor announced an extension for the early closure till 31 December 2026. \n\n\n\nBus Stops Skipped for\nTemporary Early Closure of Jurong West Avenue 4 for Jurong Region Line Works\nFriday\, 17 May 2024 – Thursday\, 31 December 2026\n11:00pm – Last Bus (Daily)\n\n\n\nRoad Name\nBS Code\nBus Stop Description\nAffected Bus Service No.\n\n\nJurong West Ave 4\n22341\nBlk 673C\n99\, 193\, 242\n\n\n22349\nBlk 734A CP\n\n\nJurong West St 72\n27331\nWest Grove Pr Sch\n99\n\n\n\nNote: Service 242 will serve bus stop 27331 (West Grove Pr Sch) along Jurong West St 72 after loop towards Boon Lay Int. \n\nOperator Posters\nExtended Period (till Dec 2026) \n\n			\n				\n			\n				\n				SBS Transit Temporary Route Diversion Poster for Early Closure of Jur West Ave 4 for JRL Works (Extended to Dec 2026)\n				\n			\n				\n			\n				\n				SMRT Buses Poster for Extn of Early Closure of Jur West Ave 4 for JRL Works (Sv 193)\n				\n			\n				\n			\n				\n				SMRT Buses Poster for Extn of Early Closure of Jur West Ave 4 for JRL Works (Sv 242)\n				\n		\n\n  \nExtended Period \n\n			\n				\n			\n				\n				SMRT Buses Temporary Route Diversion Poster for Early Closure of Jur West Ave 4 for JRL Works (Extended to Oct 2025)\n				\n			\n				\n			\n				\n				SMRT Buses Temporary Route Diversion Poster for Early Closure of Jur West Ave 4 for JRL Works (Extended to Oct 2025)\n				\n			\n				\n			\n				\n				SBS Transit Temporary Route Diversion Poster for Early Closure of Jur West Ave 4 for JRL Works (Extended to Oct 2025)\n				\n		\n\nOriginal Period \n\n			\n				\n			\n				\n				SBS Transit / SMRT Buses Temporary Route Diversion Poster for Early Closure of Jurong West Ave 4\n				\n			\n				\n			\n				\n				SBS Transit / SMRT Buses Temporary Route Diversion Poster for Early Closure of Jurong West Ave 4\n				\n			\n				\n			\n				\n				SMRT Buses Temporary Route Diversion Poster for Early Closure of Jurong West Ave 4 (Sv 193)\n				\n			\n				\n			\n				\n				SMRT Buses Temporary Route Diversion Poster for Early Closure of Jurong West Ave 4 (Sv 242)\n				\n		\n\n 
URL:https://landtransportguru.net/event/bus-service-diversion-ec-jurong-west-ave-4-jrl/
CATEGORIES:Bus Service Diversions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/12/3843-99.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260419
DTEND;VALUE=DATE:20261020
DTSTAMP:20260406T062010
CREATED:20260224T060047Z
LAST-MODIFIED:20260224T061009Z
UID:148891-1776564000-1792375199@landtransportguru.net
SUMMARY:LRT Single Loop Closure: Sengkang West Inner Loop (19 Apr – 18 Oct)
DESCRIPTION:A series of works will take place on the Sengkang LRT Line (SKLRT) from Sunday 19 April 2026 to Sunday 18 October 2026. \nThese works are to connect new reception tracks from the expanded Sengkang LRT Depot to the existing mainline\, which involves: \n\nHeavy modification of the existing track\nConnect the new reception tracks to existing track\,\nInstallation and testing of signalling systems and equipment\n\nAs a result\, there will be no train service on the Sengkang LRT West Inner Loop (Sengkang → Cheng Lim → Renjong → Sengkang). \n\nMore\, including train service arrangements & shuttle bus services at: \n\nSingle Loop Operations on Sengkang LRT West Loop (Apr – Oct 2026)
URL:https://landtransportguru.net/event/sklrt-west-inner-closure-aproct26/
LOCATION:Sengkang Train Depot\, Singapore
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2024/12/Sengkang-LRT-Station-Dec24-3.jpg
END:VEVENT
END:VCALENDAR