BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20241207
DTEND;VALUE=DATE:20241211
DTSTAMP:20260408T204030
CREATED:20241107T000032Z
LAST-MODIFIED:20241209T121647Z
UID:133527-1733536800-1733795999@landtransportguru.net
SUMMARY:MRT Closure: Tanah Merah – Tampines (7–10 Dec)
DESCRIPTION:A series of works to facilitate the connection of tracks from the existing East-West Line to the East Coast Integrated Depot in preparation for its opening in 2026 will take place from Saturday 7 December 2024 to Tuesday 10 December 2024. \nAs a result\, there will be no train service on the East West Line between Tanah Merah and Tampines. \nShuttle train services will be operated as well. \nIn an update at 8pm on 9 December 2024\, LTA posted on their Facebook Page that normal EWL train service will resume on Tuesday 10 December 2024\, one day earlier than planned. \nAdjusted Train Services\n\nNo Train Service between:\nEW2–DT32 Tampines – EW4CG Tanah Merah\nShuttle Train Services will operate between:\nEW1 Pasir Ris – EW2–DT32 Tampines (5 min frequency)\nEW4CG Tanah Merah – CG1DT35 Expo (8 min frequency)\nCG1DT35 Expo – CG2 Changi Airport (11 min frequency)\n\n\n			\n				\n			\n				\n				EWL Service Adjustments Overview for Dec 2024 (Image: LTA)\n				\n		\n\n\nAffected Train Stations\n\nEW1 Pasir Ris\nEW2–DT32 Tampines\nEW3 Simei\nEW4CG Tanah Merah\nCG1DT35 Expo\nCG2 Changi Airport\n\n\nShuttle Bus Service\n\n			\n				\n			\n				\n				Shuttle 7 – SBS Transit Volvo B9TL Wright (SG5605K)\n				\n			\n				\n			\n				\n				Shuttle 7 – SBS Transit Volvo B9TL Wright (SG5380H)\n				\n		\n\nA Shuttle Bus Service will be available from Saturday\, 7 December 2024 to (Monday\, 9 December 2024). Shuttle 7 will not operate on Tuesday 10 December 2024 as EWL train service has resumed one day earlier than planned. \n\nShuttle 7: Tampines — Tanah Merah\n\n\n			\n				\n			\n				\n				Shuttle 7 Poster (Dec 2024; Tanah Merah – Tampines) Poster (1/2)\n				\n			\n				\n			\n				\n				Shuttle 7 Poster (Dec 2024; Tanah Merah – Tampines) Poster (2/2)\n				\n			\n				\n			\n				\n				Shuttle 7 (Tampines – Tanah Merah; Dec 2024) Boarding Points (Image: LTA)\n				\n		\n\n\nFind out more at 4 Day Closure on East West Line (Tanah Merah – Tampines) for Track Works
URL:https://landtransportguru.net/event/mrt-closure-ewl-dec24/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2021/11/Tanah-Merah-Viaduct-Construction-Nov21-6.jpg
END:VEVENT
END:VCALENDAR