BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20240928
DTEND;VALUE=DATE:20240930
DTSTAMP:20260413T063051
CREATED:20240919T030055Z
LAST-MODIFIED:20240929T122909Z
UID:132102-1727488800-1727575199@landtransportguru.net
SUMMARY:Sengkang LRT Single Platform Service (Sep 2024)
DESCRIPTION:Sengkang LRT Train Services will operate in one direction for both the East Loop and West Loop on Saturday 28 September 2024 & Sunday 29 September 2024 to facilitate enhancement works at STC Sengkang Town Centre LRT Station. \nAs part of the enhancement works\, one platform at every Sengkang LRT station will be closed on the affected Saturday & Sunday. Train service will continue to operate as usual on the other platform and serve all stations on the loop. \nAfter these enhancement works\, from Monday\, 30 September 2024\, there will be two train stopping locations along Platform 1 & Platform 2 at Sengkang Town Centre LRT Station. Each of the 4 routes serving this station will have a designated train stopping location.\n\n\n\n\n			\n				\n			\n				\n				SBS Transit Poster for Sengkang LRT Enhancement Works (Sep 2024)\n				\n		\n\n[Update on 29 Sep 2024] – As works were completed on 28 September 2024\, normal train service resumed on Sunday\, 29 September 2024. \n\n\n\nAffected LRT Stations\n\n\n\nSengkang LRT\n\n\nEast Loop\nWest Loop\n\n\n\n\nSTCNE16 Sengkang\nSE1 Compassvale\nSE2 Rumbia\nSE3 Bakau\nSE4 Kangkar\nSE5 Ranggung\n\n\n\n\nSTCNE16 Sengkang\nSW1 Cheng Lim\nSW2 Farmway\nSW3 Kupang\nSW4 Thanggam\nSW5 Fernvale\nSW6 Layar\nSW7 Tongkang\nSW8 Renjong\n\n\n\n\n\n  \n\nAffected Hours & Dates\nSengkang LRT – West Loop Inner (B) & East Loop Outer (C)\nLRT Train Service for  West Loop Inner (via SW1 Cheng Lim) and  East Loop Outer (via SE1  Compassvale) will be suspended on the following Saturdays & Sundays: \n\n\n\nSengkang LRT Affected Saturdays & Sundays (West Loop Inner & East Loop Outer)\n\n\nAffected Saturdays & Sundays\n\n\n\n28 & 29 September 2024\n\n\n\n\nSengkang LRT Train Service Operations on Affected Saturdays & Sundays\n\n\n\nMode\nEast Loop\nWest Loop\n\n\nSuspended\n\n\nOuter Loop (via SE1 Compassvale)\n\n\n\n\nInner Loop (via SW1 Cheng Lim)\n\n\n\n\nNormal Service\n\n\nInner Loop (via SE5  Ranggung)\n\n\n\n\nOuter Loop (via SW8 Renjong)\n\n\n\n\n\n  \n\nOperator Poster\n\n			\n				\n			\n				\n				SBS Transit Poster for Sengkang LRT Enhancement Works (Sep 2024)\n				\n		\n\n\nExternal Links & References:\n\nSBS Transit Facebook Post
URL:https://landtransportguru.net/event/sklrt-maintenance-sep24/
CATEGORIES:Train Service Changes
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/06/sklrt_stc_mar16-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20241207
DTEND;VALUE=DATE:20241211
DTSTAMP:20260413T063051
CREATED:20241107T000032Z
LAST-MODIFIED:20241209T121647Z
UID:133527-1733536800-1733795999@landtransportguru.net
SUMMARY:MRT Closure: Tanah Merah – Tampines (7–10 Dec)
DESCRIPTION:A series of works to facilitate the connection of tracks from the existing East-West Line to the East Coast Integrated Depot in preparation for its opening in 2026 will take place from Saturday 7 December 2024 to Tuesday 10 December 2024. \nAs a result\, there will be no train service on the East West Line between Tanah Merah and Tampines. \nShuttle train services will be operated as well. \nIn an update at 8pm on 9 December 2024\, LTA posted on their Facebook Page that normal EWL train service will resume on Tuesday 10 December 2024\, one day earlier than planned. \nAdjusted Train Services\n\nNo Train Service between:\nEW2–DT32 Tampines – EW4CG Tanah Merah\nShuttle Train Services will operate between:\nEW1 Pasir Ris – EW2–DT32 Tampines (5 min frequency)\nEW4CG Tanah Merah – CG1DT35 Expo (8 min frequency)\nCG1DT35 Expo – CG2 Changi Airport (11 min frequency)\n\n\n			\n				\n			\n				\n				EWL Service Adjustments Overview for Dec 2024 (Image: LTA)\n				\n		\n\n\nAffected Train Stations\n\nEW1 Pasir Ris\nEW2–DT32 Tampines\nEW3 Simei\nEW4CG Tanah Merah\nCG1DT35 Expo\nCG2 Changi Airport\n\n\nShuttle Bus Service\n\n			\n				\n			\n				\n				Shuttle 7 – SBS Transit Volvo B9TL Wright (SG5605K)\n				\n			\n				\n			\n				\n				Shuttle 7 – SBS Transit Volvo B9TL Wright (SG5380H)\n				\n		\n\nA Shuttle Bus Service will be available from Saturday\, 7 December 2024 to (Monday\, 9 December 2024). Shuttle 7 will not operate on Tuesday 10 December 2024 as EWL train service has resumed one day earlier than planned. \n\nShuttle 7: Tampines — Tanah Merah\n\n\n			\n				\n			\n				\n				Shuttle 7 Poster (Dec 2024; Tanah Merah – Tampines) Poster (1/2)\n				\n			\n				\n			\n				\n				Shuttle 7 Poster (Dec 2024; Tanah Merah – Tampines) Poster (2/2)\n				\n			\n				\n			\n				\n				Shuttle 7 (Tampines – Tanah Merah; Dec 2024) Boarding Points (Image: LTA)\n				\n		\n\n\nFind out more at 4 Day Closure on East West Line (Tanah Merah – Tampines) for Track Works
URL:https://landtransportguru.net/event/mrt-closure-ewl-dec24/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2021/11/Tanah-Merah-Viaduct-Construction-Nov21-6.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20241210
DTEND;VALUE=DATE:20241212
DTSTAMP:20260413T063051
CREATED:20241010T030005Z
LAST-MODIFIED:20241201T031332Z
UID:132558-1733796000-1733882399@landtransportguru.net
SUMMARY:Opening of New Punggol Coast MRT Station
DESCRIPTION:NE18 Punggol Coast station on the North-East Line (NEL) will open on Tuesday\, 10 December 2024 at 3pm. \n\nPunggol Coast MRT Station to open on 10 Dec 2024
URL:https://landtransportguru.net/event/punggol-coast-station-opening/
LOCATION:Punggol Coast MRT Station\, 101 New Punggol Road\, Singapore\, 828604\, Singapore
CATEGORIES:Train Service Changes,Train Stations
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2024/10/LTA-Punggol-Coast-Platform.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20241230
DTEND;VALUE=DATE:20250101
DTSTAMP:20260413T063051
CREATED:20241216T030041Z
LAST-MODIFIED:20241216T030937Z
UID:135111-1735524000-1735610399@landtransportguru.net
SUMMARY:BPLRT Full Day & Daily Service Resumption for Service A
DESCRIPTION:Service A (via Senja) on the Bukit Panjang LRT network will resume full day operations daily (including Weekdays) from Monday\, 30 December 2024. \nService A was adjusted to operate only during Weekday Peak Hours\, except Public Holidays (Start of Service – 9.00 am & 5.00 pm – 8.00 pm) from 1 December 2019 as part of the Bukit Panjang LRT Overhaul. Service was gradually resumed as follows:\n \n\nResumed between 11.00 am to 1.00pm and 5.00pm to 7.00pm on Saturdays from 16 March 2024\nResumed between 11.00 am to 1.00pm and 5.00pm to 7.00pm on Sundays from 30 June 2024\nResumed the entire day on Weekends & Public Holidays from 28 September 2024\nResumed the entire day on Weekdays from 30 December 2024\n\n\nReference: LTA Facebook Post \n  \n 
URL:https://landtransportguru.net/event/bplrt-full-resumption-sv-a/
LOCATION:Bukit Panjang\, Singapore
CATEGORIES:Train Service Changes
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2022/05/BPLRT-Service-B-only.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260117
DTEND;VALUE=DATE:20260411
DTSTAMP:20260413T063051
CREATED:20251205T020004Z
LAST-MODIFIED:20260326T150815Z
UID:146377-1768615200-1775786399@landtransportguru.net
SUMMARY:CCL Service Reduction for Tunnel Maintenance Works (Jan–Apr 2026)
DESCRIPTION:Reduced train services along the entire Circle Line (CCL) will take place from Saturday 17 January 2026 to Thursday 9 April 2026 (Early opening announced on 26 Mar 2026 – originally planned to end after Sunday 19 April 2026) to facilitate essential tunnel strengthening works between Mountbatten\, Dakota and Paya Lebar stations. \nAs a result\, there will be modified CCL train services & reduced train frequencies during this period. \nNormal train services will resume on Friday 10 April 2026 (As announced by the Land Transport Authority on 26 Mar 2026). \n\nMore\, including train service arrangements & shuttle bus services at: \n\nReduced Circle Line Services for Tunnel Maintenance Works (Jan–Apr 2026) \n\n  \n\n\n			\n				\n			\n				\n				Reduced CCL service infographic (Jan-Apr 2026)\n				\n		\n\n\nAffected MRT Stations\n\nCC1NS24NE6 Dhoby Ghaut\nCC2 Bras Basah\nCC3 Esplanade\nCC4DT15 Promenade\nCC5 Nicoll Highway\nCC6 Stadium\nCC7 Mountbatten\nCC8 Dakota\nCC9EW8 Paya Lebar\nCC10DT26 MacPherson\nCC11 Tai Seng\nCC12 Bartley\nCC13NE12 Serangoon\nCC14 Lorong Chuan\nCC15NS17 Bishan\nCC16 Marymount\nCC17TE9 Caldecott\nCC19DT9 Botanic Gardens\nCC20 Farrer Road\nCC21 Holland Village\nCC22EW21 Buona Vista\nCC23 one-north\nCC24 Kent Ridge\nCC25 Haw Par Villa\nCC26 Pasir Panjang\nCC27 Labrador Park\nCC28 Telok Blangah\nCC29NE1 HarbourFront\nCE1DT16 Bayfront\nCE2NS27TE20 Marina Bay\n\n 
URL:https://landtransportguru.net/event/ccl-service-reduction-tunnel-maintenance-works-jan-apr-2026/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2023/07/Paya-Lebar-CCL-middle-platform-boarding-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260314
DTEND;VALUE=DATE:20260318
DTSTAMP:20260413T063051
CREATED:20260224T054542Z
LAST-MODIFIED:20260316T093436Z
UID:148888-1773453600-1773712799@landtransportguru.net
SUMMARY:MRT Closure: Tanah Merah – Expo (14 – 16 Mar)
DESCRIPTION:Works to disconnect reception tracks linking the East West Line (EWL) to Changi Depot will take place from Saturday 14 March 2026 to Monday 16 March 2026. (Originally planned till Tuesday 17 March 2026) \nThe early resumption was announced by the Land Transport Authority in the evening of 16 Mar 2026. \nAs a result\, there will be no train service on the East West Line between Tanah Merah – Expo. \n  \n\nMore\, including train service arrangements & shuttle bus services at: \n\n4 Day Closure on East-West Line (Tanah Merah – Expo) for Track Works \n\n\n			\n				\n			\n				\n				Shuttle 8 – SMRT Buses MAN A95 Euro 6 (SG6048L)
URL:https://landtransportguru.net/event/mrt-closure-ewl-mar26/
LOCATION:Tanah Merah\, Singapore
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/03/ewl_cg1_mar16-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260419
DTEND;VALUE=DATE:20261020
DTSTAMP:20260413T063051
CREATED:20260224T060047Z
LAST-MODIFIED:20260224T061009Z
UID:148891-1776564000-1792375199@landtransportguru.net
SUMMARY:LRT Single Loop Closure: Sengkang West Inner Loop (19 Apr – 18 Oct)
DESCRIPTION:A series of works will take place on the Sengkang LRT Line (SKLRT) from Sunday 19 April 2026 to Sunday 18 October 2026. \nThese works are to connect new reception tracks from the expanded Sengkang LRT Depot to the existing mainline\, which involves: \n\nHeavy modification of the existing track\nConnect the new reception tracks to existing track\,\nInstallation and testing of signalling systems and equipment\n\nAs a result\, there will be no train service on the Sengkang LRT West Inner Loop (Sengkang → Cheng Lim → Renjong → Sengkang). \n\nMore\, including train service arrangements & shuttle bus services at: \n\nSingle Loop Operations on Sengkang LRT West Loop (Apr – Oct 2026)
URL:https://landtransportguru.net/event/sklrt-west-inner-closure-aproct26/
LOCATION:Sengkang Train Depot\, Singapore
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2024/12/Sengkang-LRT-Station-Dec24-3.jpg
END:VEVENT
END:VCALENDAR