BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.17.5.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Land Transport Guru
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20250101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260419
DTEND;VALUE=DATE:20261005
DTSTAMP:20261002T081602Z
CREATED:20260224T060047Z
LAST-MODIFIED:20261002T081602Z
UID:148891-1776564000-1791079199@landtransportguru.net
SUMMARY:LRT Single Loop Closure: Sengkang West Inner Loop (19 Apr – 3 Oct)
DESCRIPTION:A series of works will take place on the Sengkang LRT Line (SKLRT) from Sunday 19 April 2026 to Saturday 3 October 2026. \nThese works are to connect new reception tracks from the expanded Sengkang LRT Depot to the existing mainline\, which involves: \n\nHeavy modification of the existing track\nConnect the new reception tracks to existing track\,\nInstallation and testing of signalling systems and equipment\n\nAs a result\, there will be no train service on the Sengkang LRT West Inner Loop (Sengkang → Cheng Lim → Renjong → Sengkang). \nOriginally planned to take place till Sunday 18 October 2026\, train services were announced to resume earlier on Sunday 4 October 2026 by the Land Transport Authority on 2 October 2026. \n\nMore\, including train service arrangements & shuttle bus services at: \n\nSingle Loop Operations on Sengkang LRT West Loop (Apr – Oct 2026)
URL:https://landtransportguru.net/event/sklrt-west-inner-closure-aproct26/
LOCATION:Sengkang Train Depot\, Singapore
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2024/12/Sengkang-LRT-Station-Dec24-3.jpg
END:VEVENT
END:VCALENDAR