BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Land Transport Guru - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://landtransportguru.net
X-WR-CALDESC:Events for Land Transport Guru
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20180101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200619T220000
DTEND;TZID=Asia/Shanghai:20200622T000000
DTSTAMP:20260407T234343
CREATED:20200324T051249Z
LAST-MODIFIED:20200412T234843Z
UID:80253-1592604000-1592784000@landtransportguru.net
SUMMARY:MRT Early Closure & Late Opening: Woodlands North – Woodlands South (19 – 21 June)
DESCRIPTION:Shorter operating hours along the Thomson-East Coast Line (TEL) between Woodlands North and Woodlands South will take place on Fridays\, Saturdays & Sundays from 3 April 2020 to 26 July 2020 to facilitate additional engineering hours to test the systems and trains in preparation for the opening of TEL Stage 2 later in 2020. \nThis will involve early closures & late openings along the TEL. \nAffected Train Stations\n\nTE1 Woodlands North\nTE2NS9 Woodlands\nTE3 Woodlands South\n\nTrain services between Woodlands North – Woodlands South on the Thomson-East Coast Line will: \n\nEnd earlier at around 10.00pm on Friday\, 19 June 2020\, Saturday\, 20 June 2020 & Sunday\, 21 June 2020\nStart later at around 6.30am on Saturday\, 20 June 2020 & Sunday\, 21 June 2020\n\nFind out more (including affected train timings) at Early Closure of Thomson-East Coast Line (April – July 2020) \n\nSee Also: MRT Early Closure: Jurong East – Choa Chu Kang & Buona Vista – Boon Lay (19 – 20 June)
URL:https://landtransportguru.net/event/eclo-jun20-3/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/02/Woodlands-MRT-Station-Feb20-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200612T220000
DTEND;TZID=Asia/Shanghai:20200615T000000
DTSTAMP:20260407T234343
CREATED:20200324T051134Z
LAST-MODIFIED:20200412T234812Z
UID:80251-1591999200-1592179200@landtransportguru.net
SUMMARY:MRT Early Closure & Late Opening: Woodlands North – Woodlands South (12 – 14 June)
DESCRIPTION:Shorter operating hours along the Thomson-East Coast Line (TEL) between Woodlands North and Woodlands South will take place on Fridays\, Saturdays & Sundays from 3 April 2020 to 26 July 2020 to facilitate additional engineering hours to test the systems and trains in preparation for the opening of TEL Stage 2 later in 2020. \nThis will involve early closures & late openings along the TEL. \nAffected Train Stations\n\nTE1 Woodlands North\nTE2NS9 Woodlands\nTE3 Woodlands South\n\nTrain services between Woodlands North – Woodlands South on the Thomson-East Coast Line will: \n\nEnd earlier at around 10.00pm on Friday\, 12 June 2020\, Saturday\, 13 June 2020 & Sunday\, 14 June 2020\nStart later at around 6.30am on Saturday\, 13 June 2020 & Sunday\, 14 June 2020\n\nFind out more (including affected train timings) at Early Closure of Thomson-East Coast Line (April – July 2020) \n\nSee Also: MRT Early Closure: Jurong East – Choa Chu Kang & Buona Vista – Boon Lay (12 – 13 June) \n  \n 
URL:https://landtransportguru.net/event/eclo-jun20-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/02/Woodlands-South-MRT-Station-Feb20-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200605T220000
DTEND;TZID=Asia/Shanghai:20200608T000000
DTSTAMP:20260407T234343
CREATED:20200324T051005Z
LAST-MODIFIED:20200412T234644Z
UID:80248-1591394400-1591574400@landtransportguru.net
SUMMARY:MRT Early Closure & Late Opening: Woodlands North – Woodlands South (5 – 7 June)
DESCRIPTION:Shorter operating hours along the Thomson-East Coast Line (TEL) between Woodlands North and Woodlands South will take place on Fridays\, Saturdays & Sundays from 3 April 2020 to 26 July 2020 to facilitate additional engineering hours to test the systems and trains in preparation for the opening of TEL Stage 2 later in 2020. \nThis will involve early closures & late openings along the TEL. \nAffected Train Stations\n\nTE1 Woodlands North\nTE2NS9 Woodlands\nTE3 Woodlands South\n\nTrain services between Woodlands North – Woodlands South on the Thomson-East Coast Line will: \n\nEnd earlier at around 10.00pm on Friday\, 5 June 2020\, Saturday\, 6 June 2020 & Sunday\, 7 June 2020\nStart later at around 6.30am on Saturday\, 6 June 2020 & Sunday\, 7 June 2020\n\nFind out more (including affected train timings) at Early Closure of Thomson-East Coast Line (April – July 2020) \n\nSee Also: MRT Early Closure: Jurong East – Choa Chu Kang & Buona Vista – Boon Lay (5 – 6 June) \n 
URL:https://landtransportguru.net/event/eclo-jun20-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/02/Woodlands-South-MRT-Station-Feb20-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20200417
DTEND;VALUE=DATE:20200603
DTSTAMP:20260407T234343
CREATED:20200414T140003Z
LAST-MODIFIED:20200421T091843Z
UID:81329-1587088800-1591063199@landtransportguru.net
SUMMARY:Rail Network Early Closures & Reduced Frequencies due to Singapore COVID-19 Circuit Breaker Measures
DESCRIPTION:Due to a decline in rail ridership amidst the COVID-19 circuit breaker measures\, all rail lines will run at lower frequencies and have their operating hours shortened. \nIn addition\, train service on the Sengkang-Punggol LRT line will only operate a single loop service during off-peak hours. \n\nSingapore COVID-19 Circuit Breaker Measures – MRT & LRT Early Closures & Reduced Frequencies
URL:https://landtransportguru.net/event/rail-network-early-closures-reduced-frequencies-due-to-singapore-covid-19-circuit-breaker-measures/
CATEGORIES:Events,Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/02/C151_stock.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200410T220000
DTEND;TZID=Asia/Shanghai:20200413T000000
DTSTAMP:20260407T234343
CREATED:20200324T050123Z
LAST-MODIFIED:20200412T234249Z
UID:80232-1586556000-1586736000@landtransportguru.net
SUMMARY:MRT Early Closure & Late Opening: Woodlands North – Woodlands South (10 – 12 Apr)
DESCRIPTION:Shorter operating hours along the Thomson-East Coast Line (TEL) between Woodlands North and Woodlands South will take place on Fridays\, Saturdays & Sundays from 3 April 2020 to 26 July 2020 to facilitate additional engineering hours to test the systems and trains in preparation for the opening of TEL Stage 2 later in 2020. \nThis will involve early closures & late openings along the TEL. \nAffected Train Stations\n\nTE1 Woodlands North\nTE2NS9 Woodlands\nTE3 Woodlands South\n\nTrain services between Woodlands North – Woodlands South on the Thomson-East Coast Line will: \n\nEnd earlier at around 10.00pm on Friday\, 10 April 2020\, Saturday\, 11 April 2020 & Sunday\, 12 April 2020\n\nStart later at around 6.30am on Saturday\, 11 April 2020 & Sunday\, 12 April 2020\n\nFind out more (including affected train timings) at Early Closure of Thomson-East Coast Line (April – July 2020)
URL:https://landtransportguru.net/event/eclo-apr20-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/02/Woodlands-South-MRT-Station-Feb20-12.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200403T230000
DTEND;TZID=Asia/Shanghai:20200405T013000
DTSTAMP:20260407T234343
CREATED:20200326T140006Z
LAST-MODIFIED:20200402T071341Z
UID:80327-1585954800-1586050200@landtransportguru.net
SUMMARY:MRT Early Closure: Aljunied – Tanah Merah (3 – 4 Apr)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Aljunied and Tanah Merah will take place on selected Fridays & Saturdays in April 2020 to facilitate additional engineering hours for power supply system renewal works. \nThis will involve early closures along the EWL. \nAffected Train Stations\n\nEW4CG Tanah Merah\nEW5 Bedok\nEW6 Kembangan\nEW7 Eunos\nEW8CC9 Paya Lebar\nEW9 Aljunied\n\nTrain services between Aljunied – Tanah Merah on the East West Line will: \n\nEnd earlier at around 11.00pm on Friday\, 3 April 2020 & Saturday\, 4 April 2020\n\n\nFind out more (including affected train timings) at Early Closure of East West Line (April 2020) \nTrain Service will only operate between EW1 Pasir Ris – EW4CG Tanah Merah\, EW9 Aljunied – EW33 Tuas Link and EW4CG Tanah Merah –  CG2 Changi Airport during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 7: Aljunied — Tanah Merah\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nBedok Bus Interchange\nBus Services 222\, 225G\, 228 & 229\nLast bus at 1:10am\nEunos Bus Interchange\nBus Services 60A & 63M\nLast bus at 12:55am\n\n  \n\nSee Also: MRT Early Closure & Late Opening: Woodlands North – Woodlands South (3 – 5 Apr)
URL:https://landtransportguru.net/event/ec-apr20-5/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/07/C151-stock-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200403T220000
DTEND;TZID=Asia/Shanghai:20200407T000000
DTSTAMP:20260407T234343
CREATED:20200324T050056Z
LAST-MODIFIED:20200412T234219Z
UID:80206-1585951200-1586217600@landtransportguru.net
SUMMARY:MRT Early Closure & Late Opening: Woodlands North - Woodlands South (3 - 5 Apr)
DESCRIPTION:Shorter operating hours along the Thomson-East Coast Line (TEL) between Woodlands North and Woodlands South will take place on Fridays\, Saturdays & Sundays from 3 April 2020 to 26 July 2020 to facilitate additional engineering hours to test the systems and trains in preparation for the opening of TEL Stage 2 later in 2020. \nThis will involve early closures & late openings along the TEL. \nAffected Train Stations\n\nTE1 Woodlands North\nTE2NS9 Woodlands\nTE3 Woodlands South\n\nTrain services between Woodlands North – Woodlands South on the Thomson-East Coast Line will: \n\nEnd earlier at around 10.00pm on Friday\, 3 April 2020\, Saturday\, 4 April 2020 & Sunday\, 5 April 2020\n\nStart later at around 6.30am on Saturday\, 4 April 2020 & Sunday\, 5 April 2020\n\nFind out more (including affected train timings) at Early Closure of Thomson-East Coast Line (April – July 2020) \n\nSee Also: MRT Early Closure: Aljunied – Tanah Merah (3 – 4 Apr)
URL:https://landtransportguru.net/event/eclo-apr20-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/02/Woodlands-North-MRT-Station-Feb20-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200330T220000
DTEND;TZID=Asia/Shanghai:20200401T003000
DTSTAMP:20260407T234343
CREATED:20200323T120338Z
LAST-MODIFIED:20200323T144618Z
UID:80192-1585605600-1585701000@landtransportguru.net
SUMMARY:Early Closure of Sentosa Express (30 & 31 Mar)
DESCRIPTION:Early Closures along the Sentosa Express Monorail Line will take place on Mondays to Fridays from 11 March 2020 to 31 March 2020. \nAffected Monorail Stations:\nSentosa Express \n\nVivoCity\nResorts World\nImbiah\nBeach\n\nMonorail services between VivoCity – Beach will: \n\nEnd earlier at around 10.00pm on Monday\, 30 March 2020 & Tuesday\, 31 March 2020.\n\n\nFind out more at Early Closure of Sentosa Express (March 2020)
URL:https://landtransportguru.net/event/ec-sentosa-mar20-4/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/03/Sentosa-Monorail-Stock-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200327T230000
DTEND;TZID=Asia/Shanghai:20200329T013000
DTSTAMP:20260407T234343
CREATED:20200112T100712Z
LAST-MODIFIED:20200324T053750Z
UID:77925-1585350000-1585445400@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (27 – 28 Mar)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 27 March 2020 & Saturday\, 28 March 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am\n\n 
URL:https://landtransportguru.net/event/ec-mar20-4/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2019/11/Canberra-MRT-Station-Tracks-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200323T220000
DTEND;TZID=Asia/Shanghai:20200328T003000
DTSTAMP:20260407T234343
CREATED:20200323T120228Z
LAST-MODIFIED:20200323T144428Z
UID:80190-1585000800-1585355400@landtransportguru.net
SUMMARY:Early Closure of Sentosa Express (23 - 27 Mar)
DESCRIPTION:Early Closures along the Sentosa Express Monorail Line will take place on Mondays to Fridays from 11 March 2020 to 31 March 2020. \nAffected Monorail Stations:\nSentosa Express \n\nVivoCity\nResorts World\nImbiah\nBeach\n\nMonorail services between VivoCity – Beach will: \n\nEnd earlier at around 10.00pm on Monday\, 23 March 2020 – Friday\, 27 March 2020.\n\n\nFind out more at Early Closure of Sentosa Express (March 2020)
URL:https://landtransportguru.net/event/ec-sentosa-mar20-3/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/03/Sentosa-Monorail-Stock-5.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200320T230000
DTEND;TZID=Asia/Shanghai:20200322T013000
DTSTAMP:20260407T234343
CREATED:20200112T100637Z
LAST-MODIFIED:20200324T053559Z
UID:77923-1584745200-1584840600@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (20 – 21 Mar)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 20 March 2020 & Saturday\, 21 March 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am\n\n 
URL:https://landtransportguru.net/event/ec-mar20-3/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2019/11/Canberra-MRT-Station-Tracks-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200316T220000
DTEND;TZID=Asia/Shanghai:20200321T003000
DTSTAMP:20260407T234343
CREATED:20200323T120155Z
LAST-MODIFIED:20200323T143904Z
UID:80188-1584396000-1584750600@landtransportguru.net
SUMMARY:Early Closure of Sentosa Express (16 - 20 Mar)
DESCRIPTION:Early Closures along the Sentosa Express Monorail Line will take place on Mondays to Fridays from 11 March 2020 to 31 March 2020. \nAffected Monorail Stations:\nSentosa Express \n\nVivoCity\nResorts World\nImbiah\nBeach\n\nMonorail services between VivoCity – Beach will: \n\nEnd earlier at around 10.00pm on Monday\, 16 March 2020 – Friday\, 20 March 2020.\n\n\nFind out more at Early Closure of Sentosa Express (March 2020)
URL:https://landtransportguru.net/event/ec-sentosa-mar20-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/03/Sentosa-Monorail-Blue.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200313T230000
DTEND;TZID=Asia/Shanghai:20200315T013000
DTSTAMP:20260407T234343
CREATED:20200112T100534Z
LAST-MODIFIED:20200324T053623Z
UID:77921-1584140400-1584235800@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (13 – 14 Mar)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 13 March 2020 & Saturday\, 14 March 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am\n\n 
URL:https://landtransportguru.net/event/ec-mar20-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2019/11/Canberra-MRT-Station-Linkbridge-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200311T220000
DTEND;TZID=Asia/Shanghai:20200314T003000
DTSTAMP:20260407T234343
CREATED:20200323T120006Z
LAST-MODIFIED:20200323T143735Z
UID:80185-1583964000-1584145800@landtransportguru.net
SUMMARY:Early Closure of Sentosa Express (11 - 13 Mar)
DESCRIPTION:Early Closures along the Sentosa Express Monorail Line will take place on Mondays to Fridays from 11 March 2020 to 31 March 2020. \nAffected Monorail Stations:\nSentosa Express \n\nVivoCity\nResorts World\nImbiah\nBeach\n\nMonorail services between VivoCity – Beach will: \n\nEnd earlier at around 10.00pm on Wednesday\, 11 March 2020 – Friday\, 13 March 2020.\n\n\nFind out more at Early Closure of Sentosa Express (March 2020)
URL:https://landtransportguru.net/event/ec-sentosa-mar20-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/12/sentosa-monorail-stock.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200306T230000
DTEND;TZID=Asia/Shanghai:20200308T013000
DTSTAMP:20260407T234343
CREATED:20200112T100451Z
LAST-MODIFIED:20200324T053740Z
UID:77919-1583535600-1583631000@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (6 – 7 Mar)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 6 March 2020 & Saturday\, 7 March 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am\n\n 
URL:https://landtransportguru.net/event/ec-mar20-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/06/nsl_ns13_mar16-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200228T230000
DTEND;TZID=Asia/Shanghai:20200301T013000
DTSTAMP:20260407T234343
CREATED:20200112T100352Z
LAST-MODIFIED:20200324T053728Z
UID:77916-1582930800-1583026200@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (28 – 29 Feb)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 28 February 2020 & Saturday\, 29 February 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am
URL:https://landtransportguru.net/event/ec-feb20-3/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/06/nsl_ns14_mar16-8.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200227T053000
DTEND;TZID=Asia/Shanghai:20200227T123000
DTSTAMP:20260407T234343
CREATED:20200226T230525Z
LAST-MODIFIED:20200227T170709Z
UID:79404-1582781400-1582806600@landtransportguru.net
SUMMARY:⚠️ North East Line Power Fault (Punggol - Hougang)
DESCRIPTION:A power fault disrupted the North East for 6.5 hours in the morning of 27th February. \nTimeline \n\n5:55am: SBS Transit reports Power Fault at Sengkang Station. Train service between Punggol and Buangkok reduced to a shuttle train on Platform A.\n6:30am: Free bridging bus services and regular bus services provided at affected stations.\n10:40am: To facilitate repair works\, trains service between Punggol and Hougang was suspended\, while a single shuttle train operated between Hougang and Serangoon. Regular train services operated at 9 min frequency.\n12:27pm: Train service resumed.\n\n\n			\n				\n			\n				\n				North East Line Power Fault – 27 Feb 2020\n				\n			\n				\n			\n				\n				North East Line Power Fault – 27 Feb 2020\n				\n			\n				\n			\n				\n				North East Line Power Fault – 27 Feb 2020: Free Bridging Bus\n				\n			\n				\n			\n				\n				North East Line Power Fault – 27 Feb 2020: Punggol Station\n				\n			\n				\n			\n				\n				North East Line Power Fault – 27 Feb 2020: Free Bridging Bus\n				\n			\n				\n			\n				\n				North East Line Free Bridging Bus – SBS Transit Volvo B9TL Wright (SG5506m)\n				\n			\n				\n			\n				\n				North East Line Free Bridging Bus – SBS Transit Mercedes-Benz Citaro (SBS6774L)\n				\n			\n				\n			\n				\n				North East Line Free Bridging Bus – SBS Transit MAN A22 (SMB3125P)\n				\n			\n				\n			\n				\n				North East Line Free Bridging Bus – SBS Transit Scania K230UB (SBS8700L)\n				\n		\n\nLast updated at 12:30pm \n\nSBS Transit Media Statement\nNorth East Line (NEL) services affected by power fault\nThis morning\, train services from NE17 Punggol to NE15 Buangkok stations in the direction towards HarbourFront were disrupted by a power fault. Train services between NE1 HarbourFront and NE14 Hougang stations were not affected. \nA shuttle train service was put into operation from the start of passenger service at 5.36am and operated on one platform between NE17 Punggol and NE15 Buangkok stations. To supplement the shuttle train service\, free regular and bridging bus services were available at designated bus stops along the affected stations to maintain connectivity. \nInitial investigations into the incident revealed the cause to be a broken contact wire of the Overhead Catenary System (OCS) at the train launching track of Sengkang depot. The OCS supplies power to the trains. Repair works to the OCS were carried out after the morning peak hours. To facilitate this\, power supply to the tracks was shut off between NE14 Hougang and NE17 Punggol stations\, and free regular and bridging bus services were available between these stations. \nThe repair works were completed by 11.49am and a safety sweep of the affected sector was carried out by a non-passenger train. Normal service along the entire NEL resumed at 12.14pm. \nThroughout this time\, regular train services operated between NE1 HarbourFront and NE12 Serangoon stations at a frequency of about 9 minutes\, while shuttle trains ran between NE12 Serangoon and NE14 Hougang stations. \nWe apologise to affected commuters for the inconvenience caused. Meanwhile\, we are jointly investigating the incident with the Land Transport Authority. \n 
URL:https://landtransportguru.net/event/%e2%9a%a0%ef%b8%8f-north-east-line-power-fault-punggol-hougang/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2020/02/3125_NEL-Bridging-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200221T230000
DTEND;TZID=Asia/Shanghai:20200223T013000
DTSTAMP:20260407T234343
CREATED:20200112T100223Z
LAST-MODIFIED:20200324T053709Z
UID:77914-1582326000-1582421400@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (21 – 22 Feb)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 21 February 2020 & Saturday\, 22 February 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am\n\n 
URL:https://landtransportguru.net/event/ec-feb20-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/06/nsl_ns15_mar16-9.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200207T230000
DTEND;TZID=Asia/Shanghai:20200209T013000
DTSTAMP:20260407T234343
CREATED:20200112T100019Z
LAST-MODIFIED:20200324T053701Z
UID:77912-1581116400-1581211800@landtransportguru.net
SUMMARY:MRT Early Closure: Canberra – Ang Mo Kio (7 – 8 Feb)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Canberra and Ang Mo Kio will take place on selected Fridays & Saturdays in February & March 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS12 Canberra\nNS13 Yishun\nNS14 Khatib\nNS15 Yio Chu Kang\nNS16 Ang Mo Kio\n\nTrain services between Canberra – Ang Mo Kio on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 7 February 2020 & Saturday\, 8 February 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (February & March 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS12 Canberra and NS16 Ang Mo Kio – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 10: Canberra — Ang Mo Kio\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:35am\nYishun Bus Interchange\nBus Services 804 & 812\nLast bus at 1:15am
URL:https://landtransportguru.net/event/ec-feb20-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/06/nsl_ns16_mar16-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200110T230000
DTEND;TZID=Asia/Shanghai:20200112T013000
DTSTAMP:20260407T234343
CREATED:20191228T040110Z
LAST-MODIFIED:20200323T141825Z
UID:77416-1578697200-1578792600@landtransportguru.net
SUMMARY:MRT Early Closure: Ang Mo Kio – Newton (10 – 11 Jan)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Ang Mo Kio and Newton will take place on selected Fridays & Saturdays in January 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS16 Ang Mo Kio\nNS17CC15 Bishan\nNS18 Braddell\nNS19 Toa Payoh\nNS20 Novena\nNS21DT11 Newton\n\nTrain services between Ang Mo Kio – Newton on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 10 January 2020 & Saturday\, 11 January 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (January 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS16 Ang Mo Kio and NS21DT11 Newton – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 9: Ang Mo Kio — Newton\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:20am\nBishan Bus Interchange\nBus Service 410W\nLast bus at 1:15am\nToa Payoh Bus Interchange\nBus Services 232 & 238\nLast bus at 1:00am
URL:https://landtransportguru.net/event/ec-jan20-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/10/NSL-Disruption-081017-Toa-Payoh.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200108T210000
DTEND;TZID=Asia/Shanghai:20200109T010000
DTSTAMP:20260407T234343
CREATED:20200108T120019Z
LAST-MODIFIED:20200108T121207Z
UID:77794-1578517200-1578531600@landtransportguru.net
SUMMARY:Urgent Punggol LRT Maintenance Works (January 2020)
DESCRIPTION:To facilitate urgent track maintenance works on the Punggol LRT Line\, one platform on the Punggol East Loop will end earlier at 9pm on Wednesday\, 8 January 2020. \nTrain service on the other platform will not be affected and will operate as per normal. \n\n\n			\n				\n			\n				\n				Urgent Track Maintenance – Punggol LRT (8 Jan 2020)
URL:https://landtransportguru.net/event/pglrt-maintenance-q1-2020-1-urgent/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2016/12/CoralEdge-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20200103T230000
DTEND;TZID=Asia/Shanghai:20200105T013000
DTSTAMP:20260407T234343
CREATED:20191228T040018Z
LAST-MODIFIED:20200323T141825Z
UID:77413-1578092400-1578187800@landtransportguru.net
SUMMARY:MRT Early Closure: Ang Mo Kio – Newton (3 – 4 Jan)
DESCRIPTION:Shorter operating hours along the North South Line (NSL) between Ang Mo Kio and Newton will take place on selected Fridays & Saturdays in January 2020 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the NSL. \nAffected Train Stations\n\nNS16 Ang Mo Kio\nNS17CC15 Bishan\nNS18 Braddell\nNS19 Toa Payoh\nNS20 Novena\nNS21DT11 Newton\n\nTrain services between Ang Mo Kio – Newton on the North South Line will: \n\nEnd earlier at around 11.00pm on Friday\, 3 January 2020 & Saturday\, 4 January 2020\n\n\nFind out more (including affected train timings) at Early Closure of North South Line (January 2020) \nTrain Service will only operate between NS1EW24 Jurong East – NS16 Ang Mo Kio and NS21DT11 Newton – NS28 Marina South Pier during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 9: Ang Mo Kio — Newton\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nAng Mo Kio Bus Interchange\nBus Services 261 & 269\nLast bus at 1:20am\nBishan Bus Interchange\nBus Service 410W\nLast bus at 1:15am\nToa Payoh Bus Interchange\nBus Services 232 & 238\nLast bus at 1:00am
URL:https://landtransportguru.net/event/ec-jan20-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/10/NSL-Disruption-081017-Toa-Payoh.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191213T230000
DTEND;TZID=Asia/Shanghai:20191215T013000
DTSTAMP:20260407T234343
CREATED:20190928T070650Z
LAST-MODIFIED:20200323T141843Z
UID:74479-1576278000-1576373400@landtransportguru.net
SUMMARY:MRT Early Closure: Tanah Merah – Pasir Ris (13 – 14 Dec)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Tanah Merah and Pasir Ris will take place on selected Fridays & Saturdays in December 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the EWL \n\n			\n				\n			\n				\n				East West Line – Early Closure (December 2019)\n				\n		\n\nAffected Train Stations\n\nEW1 Pasir Ris\nEW2DT32 Tampines\nEW3 Simei\nEW4CG Tanah Merah\n\nTrain services between Tanah Merah – Pasir Ris on the East West Line will: \n\nEnd earlier at around 11.00pm on Friday\, 13 December 2019 & Saturday\, 14 December 2019\n\n\nFind out more (including affected train timings) at Early Closure of East West Line (December 2019) \nTrain Service will only operate between EW4CG Tanah Merah – EW33 Tuas Link and EW4CG Tanah Merah – CG2 Changi Airport during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 7: Tanah Merah—Pasir Ris\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nTampines \nBus Services 291\, 292 & 293\nLast bus at 1:10am\nPasir Ris\nBus Services 358 & 359\nLast bus at 1:20am\n\n 
URL:https://landtransportguru.net/event/ec-dec19-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/07/Tanah-Merah-trains-3.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191207T220000
DTEND;TZID=Asia/Shanghai:20191208T010000
DTSTAMP:20260407T234343
CREATED:20191204T052000Z
LAST-MODIFIED:20191204T052759Z
UID:76641-1575756000-1575766800@landtransportguru.net
SUMMARY:Punggol LRT Early Closure (December 2019)
DESCRIPTION:Early Closure on the Punggol LRT Line will take place on Saturday\, 7 December 2019  for maintenance works\, which was announced on Wednesday\, 4 December 2019. \nAffected LRT Stations\n\n\n\nPunggol LRT\n\n\nEast Loop\n\nWest Loop\n\n\n\n\n\nPTCNE17 Punggol\nPE1 Cove\nPE2 Meridian\nPE3 Coral Edge\nPE4 Riviera\nPE5 Kadaloor\nPE6 Oasis\nPE7 Damai\n\n\n\n\nPTCNE17 Punggol\nPW1 Sam Kee\nPW3 Punggol Point\nPW4 Samudera\nPW5 Nibong\nPW6 Sumang\nPW7 Soo Teck\n\n\n\n\n\nNote: PW2 Teck Lee is not affected as the station is not in operation. \n  \n\nTrain services on the Punggol LRT line will: \n\nEnd earlier at around 10.15pm on Saturday\, 7 December 2019 \n\nFind out more at Early Closure of Punggol LRT Line (December 2019) \nShuttle Bus Services\, in which fares of same fare structure as the LRT will be charged\, will be provided at affected LRT Stations. \n 
URL:https://landtransportguru.net/event/pglrt-ec-dec19/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2019/10/PGLRT-Bridging-Bus-Oct19-2.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191206T233000
DTEND;TZID=Asia/Shanghai:20191208T013000
DTSTAMP:20260407T234343
CREATED:20190928T080620Z
LAST-MODIFIED:20200323T141843Z
UID:74477-1575675000-1575768600@landtransportguru.net
SUMMARY:MRT Early Closure: Tanah Merah – Pasir Ris (6 – 7 Dec)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Tanah Merah and Pasir Ris will take place on selected Fridays & Saturdays in December 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nThis will involve early closures along the EWL \n\n			\n				\n			\n				\n				East West Line – Early Closure (December 2019)\n				\n		\n\nAffected Train Stations\n\nEW1 Pasir Ris\nEW2DT32 Tampines\nEW3 Simei\nEW4CG Tanah Merah\n\nTrain services between Tanah Merah – Pasir Ris on the East West Line will: \n\nEnd earlier at around 11.00pm on Friday\, 6 December 2019 & Saturday\, 7 December 2019\n\n\nFind out more (including affected train timings) at Early Closure of East West Line (December 2019) \nTrain Service will only operate between EW4CG Tanah Merah – EW33 Tuas Link and EW4CG Tanah Merah – CG2 Changi Airport during the periods of closure. \nA Shuttle Bus Service will be available: \n\nShuttle Bus Service 7: Tanah Merah—Pasir Ris\n\n\nExtended Bus Operating Hours \nDuring of Early Closure\, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services. \n\nTampines \nBus Services 291\, 292 & 293\nLast bus at 1:10am\nPasir Ris\nBus Services 358 & 359\nLast bus at 1:20am\n\n 
URL:https://landtransportguru.net/event/ec-dec19-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/07/Tanah-Merah-trains-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191122T230000
DTEND;TZID=Asia/Shanghai:20191124T013000
DTSTAMP:20260407T234343
CREATED:20190928T070507Z
LAST-MODIFIED:20200323T141844Z
UID:74475-1574463600-1574559000@landtransportguru.net
SUMMARY:MRT Early Closure: Jurong East – Outram Park & Serangoon – Punggol (22 – 23 Nov)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Jurong East and Outram Park will take place on selected Fridays & Saturdays in October & November 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nIn addition\, shorter operating hours along the North East Line (NEL) between Serangoon and Punggol will take place on selected Fridays & Saturdays in November 2019 to facilitate intensified maintenance that will be carried out on the tracks as well as component replacement works for the NEL’s power and signalling systems. \nThis will involve early closures along the EWL & NEL. \n\n			\n				\n			\n				\n				East West Line – Early Closure (October & November 2019)\n				\n			\n				\n			\n				\n				North East Line (NEL) Early Closure (November 2019)\n				\n		\n\nAffected Train Stations\n\n\n\nEast West Line\nNorth East Line\n\n\n\n\nEW16NE3 Outram Park\nEW17 Tiong Bahru\nEW18 Redhill\nEW19 Queenstown\nEW20 Commonwealth\nEW21CC22 Buona Vista\nEW22 Dover\nEW23 Clementi\nEW24NS1 Jurong East\n\n\n\n\nNE12CC13 Serangoon\nNE13 Kovan\nNE14 Hougang\nNE15 Buangkok\nNE16STC Sengkang\nNE17PTC Punggol\n\n\n\n\n\n  \nTrain services between: \n\nJurong East – Outram Park on the East West Line &\nSerangoon – Punggol on the North East Line\n\nWill end earlier at around 11.00pm on Friday\, 22 November 2019 & Saturday\, 23 November 2019.\n \nFind out more (including affected train timings) at: \n\nEarly Closure of East West Line (October & November 2019) &\nEarly Closure of North East Line (November 2019)\n\nTrain Services on the East West Line will only operate between EW1 Pasir Ris – EW16NE3 Outram Park\, EW24NS1 Jurong East – EW33 Tuas Link and EW4CG Tanah Merah – CG2 Changi Airport during the periods of closure. \nIn addition\, train service will operate between NE1CC29 HarbourFront and NE12CC13 Serangoon at around 9-minute intervals during the periods of closure on the North East Line. \nShuttle Bus Services will be available: \n\nEast West Line\nShuttle Bus Service 1: Jurong East—Outram Park\nNorth East Line\nShuttle Bus Service 21: Serangoon—Punggol\n\n\nThere will also be extended operating hours for: \n\nSelected bus services from Clementi\, Jurong East\, Hougang & Punggol\nTrain service on the North East Line (Southbound) from Serangoon to HarbourFront\nTrain service on Sengkang LRT and Punggol LRT
URL:https://landtransportguru.net/event/ec-nov19-4/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/03/3437-Shuttle-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191115T230000
DTEND;TZID=Asia/Shanghai:20191117T013000
DTSTAMP:20260407T234343
CREATED:20190928T070422Z
LAST-MODIFIED:20200323T141844Z
UID:74468-1573858800-1573954200@landtransportguru.net
SUMMARY:MRT Early Closure: Jurong East – Outram Park & Serangoon – Punggol (15 – 16 Nov)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Jurong East and Outram Park will take place on selected Fridays & Saturdays in October & November 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nIn addition\, shorter operating hours along the North East Line (NEL) between Serangoon and Punggol will take place on selected Fridays & Saturdays in November 2019 to facilitate intensified maintenance that will be carried out on the tracks as well as component replacement works for the NEL’s power and signalling systems. \nThis will involve early closures along the EWL & NEL. \n\n			\n				\n			\n				\n				East West Line – Early Closure (October & November 2019)\n				\n		\n\nAffected Train Stations\n\n\n\nEast West Line\nNorth East Line\n\n\n\n\nEW16NE3 Outram Park\nEW17 Tiong Bahru\nEW18 Redhill\nEW19 Queenstown\nEW20 Commonwealth\nEW21CC22 Buona Vista\nEW22 Dover\nEW23 Clementi\nEW24NS1 Jurong East\n\n\n\n\nNE12CC13 Serangoon\nNE13 Kovan\nNE14 Hougang\nNE15 Buangkok\nNE16STC Sengkang\nNE17PTC Punggol\n\n\n\n\n\n  \nTrain services between: \n\nJurong East – Outram Park on the East West Line &\nSerangoon – Punggol on the North East Line\n\nWill end earlier at around 11.00pm on Friday\, 15 November 2019 & Saturday\, 16 November 2019.\n \nFind out more (including affected train timings) at: \n\nEarly Closure of East West Line (October & November 2019) &\nEarly Closure of North East Line (November 2019)\n\nTrain Services on the East West Line will only operate between EW1 Pasir Ris – EW16NE3 Outram Park\, EW24NS1 Jurong East – EW33 Tuas Link and EW4CG Tanah Merah – CG2 Changi Airport during the periods of closure. \nIn addition\, train service will operate between NE1CC29 HarbourFront and NE12CC13 Serangoon at around 9-minute intervals during the periods of closure on the North East Line. \nShuttle Bus Services will be available: \n\nEast West Line\nShuttle Bus Service 1: Jurong East—Outram Park\nNorth East Line\nShuttle Bus Service 21: Serangoon—Punggol\n\n\nThere will also be extended operating hours for: \n\nSelected bus services from Clementi\, Jurong East\, Hougang & Punggol\nTrain service on the North East Line (Southbound) from Serangoon to HarbourFront\nTrain service on Sengkang LRT and Punggol LRT
URL:https://landtransportguru.net/event/ec-nov19-3/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/03/5118-Shuttle-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191108T230000
DTEND;TZID=Asia/Shanghai:20191110T013000
DTSTAMP:20260407T234343
CREATED:20190928T070359Z
LAST-MODIFIED:20200323T141844Z
UID:74466-1573254000-1573349400@landtransportguru.net
SUMMARY:MRT Early Closure: Jurong East – Outram Park & Serangoon – Punggol (8 – 9 Nov)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Jurong East and Outram Park will take place on selected Fridays & Saturdays in October & November 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nIn addition\, shorter operating hours along the North East Line (NEL) between Serangoon and Punggol will take place on selected Fridays & Saturdays in November 2019 to facilitate intensified maintenance that will be carried out on the tracks as well as component replacement works for the NEL’s power and signalling systems. \nThis will involve early closures along the EWL & NEL. \n\n			\n				\n			\n				\n				East West Line – Early Closure (October & November 2019)\n				\n			\n				\n			\n				\n				North East Line (NEL) Early Closure (November 2019)\n				\n		\n\nAffected Train Stations\n\n\n\nEast West Line\nNorth East Line\n\n\n\n\nEW16NE3 Outram Park\nEW17 Tiong Bahru\nEW18 Redhill\nEW19 Queenstown\nEW20 Commonwealth\nEW21CC22 Buona Vista\nEW22 Dover\nEW23 Clementi\nEW24NS1 Jurong East\n\n\n\n\nNE12CC13 Serangoon\nNE13 Kovan\nNE14 Hougang\nNE15 Buangkok\nNE16STC Sengkang\nNE17PTC Punggol\n\n\n\n\n\n  \nTrain services between: \n\nJurong East – Outram Park on the East West Line &\nSerangoon – Punggol on the North East Line\n\nWill end earlier at around 11.00pm on Friday\, 8 November 2019 & Saturday\, 9 November 2019.\n \nFind out more (including affected train timings) at: \n\nEarly Closure of East West Line (October & November 2019) &\nEarly Closure of North East Line (November 2019)\n\nTrain Services on the East West Line will only operate between EW1 Pasir Ris – EW16NE3 Outram Park\, EW24NS1 Jurong East – EW33 Tuas Link and EW4CG Tanah Merah – CG2 Changi Airport during the periods of closure. \nIn addition\, train service will operate between NE1CC29 HarbourFront and NE12CC13 Serangoon at around 9-minute intervals during the periods of closure on the North East Line. \nShuttle Bus Services will be available: \n\nEast West Line\nShuttle Bus Service 1: Jurong East—Outram Park\nNorth East Line\nShuttle Bus Service 21: Serangoon—Punggol\n\n\nThere will also be extended operating hours for: \n\nSelected bus services from Clementi\, Jurong East\, Hougang & Punggol\nTrain service on the North East Line (Southbound) from Serangoon to HarbourFront\nTrain service on Sengkang LRT and Punggol LRT
URL:https://landtransportguru.net/event/ec-nov19-2/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2019/02/5850_S21-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191101T230000
DTEND;TZID=Asia/Shanghai:20191103T013000
DTSTAMP:20260407T234343
CREATED:20190928T070244Z
LAST-MODIFIED:20200323T141844Z
UID:74464-1572649200-1572744600@landtransportguru.net
SUMMARY:MRT Early Closure: Jurong East – Outram Park & Serangoon – Punggol (1 – 2 Nov)
DESCRIPTION:Shorter operating hours along the East West Line (EWL) between Jurong East and Outram Park will take place on selected Fridays & Saturdays in October & November 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works. \nIn addition\, shorter operating hours along the North East Line (NEL) between Serangoon and Punggol will take place on selected Fridays & Saturdays in November 2019 to facilitate intensified maintenance that will be carried out on the tracks as well as component replacement works for the NEL’s power and signalling systems. \nThis will involve early closures along the EWL & NEL. \n\n			\n				\n			\n				\n				East West Line – Early Closure (October & November 2019)\n				\n			\n				\n			\n				\n				North East Line (NEL) Early Closure (November 2019)\n				\n		\n\nAffected Train Stations\n\n\n\nEast West Line\nNorth East Line\n\n\n\n\nEW16NE3 Outram Park\nEW17 Tiong Bahru\nEW18 Redhill\nEW19 Queenstown\nEW20 Commonwealth\nEW21CC22 Buona Vista\nEW22 Dover\nEW23 Clementi\nEW24NS1 Jurong East\n\n\n\n\nNE12CC13 Serangoon\nNE13 Kovan\nNE14 Hougang\nNE15 Buangkok\nNE16STC Sengkang\nNE17PTC Punggol\n\n\n\n\n\n  \nTrain services between: \n\nJurong East – Outram Park on the East West Line &\nSerangoon – Punggol on the North East Line\n\nWill end earlier at around 11.00pm on Friday\, 1 November 2019 & Saturday\, 2 November 2019.\n \nFind out more (including affected train timings) at: \n\nEarly Closure of East West Line (October & November 2019) &\nEarly Closure of North East Line (November 2019)\n\nTrain Services on the East West Line will only operate between EW1 Pasir Ris – EW16NE3 Outram Park\, EW24NS1 Jurong East – EW33 Tuas Link and EW4CG Tanah Merah – CG2 Changi Airport during the periods of closure. \nIn addition\, train service will operate between NE1CC29 HarbourFront and NE12CC13 Serangoon at around 9-minute intervals during the periods of closure on the North East Line. \nShuttle Bus Services will be available: \n\nEast West Line\nShuttle Bus Service 1: Jurong East—Outram Park\nNorth East Line\nShuttle Bus Service 21: Serangoon—Punggol\n\n\nThere will also be extended operating hours for: \n\nSelected bus services from Clementi\, Jurong East\, Hougang & Punggol\nTrain service on the North East Line (Southbound) from Serangoon to HarbourFront\nTrain service on Sengkang LRT and Punggol LRT
URL:https://landtransportguru.net/event/ec-nov19-1/
CATEGORIES:Train Service Changes,Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2017/12/5100_S1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20191020T053000
DTEND;TZID=Asia/Shanghai:20191020T173000
DTSTAMP:20260407T234343
CREATED:20190607T011802Z
LAST-MODIFIED:20190614T010711Z
UID:70775-1571549400-1571592600@landtransportguru.net
SUMMARY:Sengkang LRT Maintenance Works (October 2019)
DESCRIPTION:Maintenance works on Sengkang LRT | Sunday\, 20th October 2019\n\n\nTrain Service Operates:\nEast Loop\nWest Loop\n\n\nBefore 1730hrs\nOuter Loop (via SE1 Compassvale)\nInner Loop (via SW1 Cheng Lim)\n\n\nAfter 1730hrs\nBoth Directions\nBoth Directions\n\n\n\nTo facilitate asset renewal and maintenance works on the Sengkang LRT network\, Train Services will only commence at 5:30 pm on Sunday\, 20 October 2019 for the following LRT Services: \n\n Sengkang West LRT  via SW8 Renjong\n(West Loop Outer / Route A)\n Sengkang East LRT  via SE5  Ranggung\n(East Loop Inner / Route D)\n\n\nSengkang LRT Services will only operate via: \n\nSW1 Cheng Lim on the  West Loop \n(West Loop Inner / Route B)\nSE1 Compassvale on the  East Loop  and;\n(East Loop Outer / Route C)\n\nuntil 5:30 pm\, when normal LRT services resume on both loops. \nMain Article: Sengkang LRT Maintenance Works (June – October 2019) \n\nOperator Poster\n\n			\n				\n			\n				\n				Sengkang LRT Maintenance Works (June – October 2019)
URL:https://landtransportguru.net/event/sklrt-maintenance-q3-2019-18/
CATEGORIES:Train Service Disruptions
ATTACH;FMTTYPE=image/jpeg:https://landtransportguru.net/web/wp-content/uploads/2018/09/SPLRT_Stock-2.jpg
END:VEVENT
END:VCALENDAR