Tukang MRT Station

JS10
Tukang
Lines Served   Jurong Region Line
Operator TBC
Structure Elevated
Platform Island
Opening Year 2028

Tukang MRT Station (JS10) is an elevated station located along the Jurong Region Line (JRL) Phase 3. It is built along Jalan Boon Lay, near the junction with Jalan Tukang, bringing rail connectivity to industrial buildings in the area.

The station is targeted for completion and opening in Year 2028.


First / Last Train Timings

Jurong Region Line – JS10 Tukang
Destination First Train Last Train
Weekdays
& Sat
Sun &
Public Holidays
Daily

Train Services

Tukang station has two platforms in an island platform arrangement.

The station platforms are built to four-car length to cater for future expansion, although trains will only operate in a three-car formation.

Exits

Tukang MRT station will likely have four exits leading to ground level. More details will be confirmed closer to the opening of the station.


Passenger Usage Patterns

Construction Trivia

Tukang Station will be constructed as part of Contract J111Design and Construction of Enterprise Station, Tukang Station and Viaduct for Jurong Region Line

Future Developments


Major Incidents


Gallery


External Links & References

Back to Jurong Region Line
Back to Trains

One thought on “Tukang MRT Station

  • 12 December 2019 at 9:14 PM
    Permalink

    Along corporation road around Taman Jurong area is quite high population residential area.. Any chance to have mrt around this area in future?

    Reply

Leave a Reply to DAVE Cancel reply

Your email address will not be published. Required fields are marked *