Loading Events

« All Events

  • This event has passed.

Sengkang LRT Maintenance Works (14-15 Aug)

14 August 2021 - 15 August 2021

Sengkang LRT Stock Photo
Maintenance works on Sengkang LRT
Saturday, 14 August 2021 &
Sunday, 15 August 2021
Train Service
East Loop West Loop
Suspended Outer Loop (via SE1 Compassvale) Inner Loop (via SW1 Cheng Lim)
In Operation Inner Loop (via SE5 Ranggung) Outer Loop (via SW8 Renjong)

To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Service will be suspended for the following LRT Services (from Sengkang Town Centre station):

  • Sengkang West LRT via SW1 Cheng Lim
    (West Loop Inner / Route B)
  • Sengkang East LRT via SE1 Compassvale
    (East Loop Outer / Route C)

Sengkang LRT Service will only operate via (from Sengkang Town Centre station):

  • Sengkang West LRT via SW8 Renjong
    (West Loop Outer / Route A)
  • Sengkang East LRT via SE5 Ranggung
    (East Loop Inner / Route D)

on Saturday, 14 August 2021 & Sunday, 15 August 2021.

Main Article: Sengkang & Punggol LRT Maintenance Works (May – September 2021)


Operator Poster

Details

Start:
14 August 2021
End:
15 August 2021
Event Category:

Leave a Reply

Your email address will not be published. Required fields are marked *