- This event has passed.
Sengkang LRT Maintenance Works (28-29 Aug)
28 August 2021 - 29 August 2021
Maintenance works on Sengkang LRT Saturday, 28 August 2021 & Sunday, 29 August 2021 |
||
Train Service |
East Loop | West Loop |
Suspended | Inner Loop (via SE5 Ranggung) | Outer Loop (via SW8 Renjong) |
In Operation | Outer Loop (via SE1 Compassvale) | Inner Loop (via SW1 Cheng Lim) |
To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Service will be suspended for the following LRT Services (from Sengkang Town Centre station):
- Sengkang West LRT via SW8 Renjong
(West Loop Outer / Route A)
- Sengkang East LRT via SE5 Ranggung
(East Loop Inner / Route D)
Sengkang LRT Service will only operate via (from Sengkang Town Centre station):
- Sengkang West LRT via SW1 Cheng Lim
(West Loop Inner / Route B)
- Sengkang East LRT via SE1 Compassvale
(East Loop Outer / Route C)
on Saturday, 28 August 2021 & Sunday, 29 August 2021.
Main Article: Sengkang & Punggol LRT Maintenance Works (May – September 2021)
Operator Poster