- This event has passed.
Sengkang LRT Maintenance Works (July 2020)
26 July 2020 @ 5:00 AM - 12:30 AM UTC+8
Maintenance works on Sengkang LRT Sunday, 26th July 2020 |
||
Train Service Operates: | East Loop | West Loop |
Inner Loop (via SE5 Ranggung) | Outer Loop (via SW8 Renjong) | |
To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Services will only commence at 5:00 pm on Sunday, 26 July 2020 will be suspended due to bad weather for the following LRT Services (from Sengkang Town Centre station):
- Sengkang West LRT via SW1 Cheng Lim
(West Loop Inner / Route B) - Sengkang East LRT via SE1 Compassvale
(East Loop Outer / Route C)
Sengkang LRT Service will only operate via (from Sengkang Town Centre station):
- SW8 Renjong on the West Loop and;
(West Loop Outer / Route A) - SE5 Ranggung on the East Loop
(East Loop Inner / Route D)
until 5:00 pm, when normal LRT services resume on both loops. for the entire day.
Main Article: Sengkang & Punggol LRT Maintenance Works (July – September 2020)
Extended Engineering Hours due to Bad Weather on 26 July 2020
Due to bad weather this afternoon, maintenance works on the Sengkang LRT will be extended today. One platform will be in service throughout operating hours with trains calling at all stations. We apologise for the inconvenience caused. https://t.co/rXiSAxkQiv
— SBS Transit (@SBSTransit_Ltd) July 26, 2020
Due to maintenance works on the Sengkang LRT today, one platform will operate as usual with trains calling at all stations while the other loop will now commence service at 7.00pm. We apologise for the inconvenience caused. https://t.co/faakTUcg9R
— SBS Transit (@SBSTransit_Ltd) July 26, 2020
Operator Poster