Corporation MRT Station

JS5
Corporation
Address 100 Jurong West Avenue 2, Singapore 649673
Line Served   Jurong Region Line
Operator TBC
Structure Elevated
Platform Island
Opening Year 2027

Corporation MRT Station (JS5) is an elevated station located along the Jurong Region Line (JRL) Phase 1. It is built along Jurong West Avenue 2, near the junction with Corporation Road, bringing rail connectivity to schools, residential developments, community amenities and industries in the area.

The station is in the vicinity of schools such as Jurong-Pioneer Junior College; community amenities such as Choice Retreat House and Jurong West NPC; and residential developments around Jurong West Street 42. It will also support future developments in the Bulim area, currently under construction.

The station is targeted for completion and opening in Year 2027.

The opening was announced to be delayed by about one year in a Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line on 1 Feb 2021, with COVID-19 cited as a reason.


First / Last Train Timings

Jurong Region Line – (JS5) Corporation
Destination First Train Last Train
Weekdays
& Sat
Sun &
Public Holidays
Daily

Train Services

MRT_rail (2)
Jurong Region Line (West) towards JW2 Tawas via JS6 Jurong West and JS8EW27 Boon Lay (→)
Jurong Region Line (West) towards JS1NS4BP1 Choa Chu Kang via JS4 Hong Kah (←)
MRT_rail (2)

Corporation station has two platforms in an island platform arrangement.

The station platforms are built to four-car length to cater for future expansion, although trains will only operate in a three-car formation.

Exits

Corporation MRT station will likely have four exits leading to ground level. More details will be confirmed closer to the opening of the station.


Construction Trivia

Corporation Station will be constructed as part of Contract J103 – Design and Construction of Hong Kah Station, Corporation Station and Viaduct for Jurong Region Line, which was awarded to Eng Lee Engineering Pte Ltd – Wai Fong Construction Pte Ltd Joint Venture at a contract value of $274.3 million in September 2019.


Gallery


External Links & References

Back to Jurong Region Line
Back to Trains

3 thoughts on “Corporation MRT Station

  • 6 October 2021 at 6:57 AM
    Permalink

    Corporation MRT Station should be ready by 2027.

    Reply
  • 5 October 2018 at 11:22 AM
    Permalink

    HI, does anyone know if Corporation station will be underground or surface ones ?

    Reply
    • 10 November 2019 at 4:41 PM
      Permalink

      The website states that it is an elevated structure i.e. above ground. All JRL stations should be above ground

      Reply

Leave a Reply to Nicholas Hee Cancel reply

Your email address will not be published. Required fields are marked *