Loading Events

« All Events

  • This event has passed.

MRT Closure: Tanah Merah – Tampines (7–10 Dec)

December 7 - December 9

A series of works to facilitate the connection of tracks from the existing East-West Line to the East Coast Integrated Depot in preparation for its opening in 2026 will take place from Saturday 7 December 2024 to Tuesday 10 December 2024.

As a result, there will be no train service on the East West Line between Tanah Merah and Tampines.

Shuttle train services will be operated as well.

In an update at 8pm on 9 December 2024, LTA posted on their Facebook Page that normal EWL train service will resume on Tuesday 10 December 2024, one day earlier than planned.

Adjusted Train Services
  • No Train Service between:
    EW2DT32 Tampines – EW4CG Tanah Merah
  • Shuttle Train Services will operate between:
    EW1 Pasir Ris – EW2DT32 Tampines (5 min frequency)
    EW4CG Tanah Merah – CG1DT35 Expo (8 min frequency)
    CG1DT35 Expo – CG2 Changi Airport (11 min frequency)

Affected Train Stations

Shuttle Bus Service

A Shuttle Bus Service will be available from Saturday, 7 December 2024 to (Monday, 9 December 2024). Shuttle 7 will not operate on Tuesday 10 December 2024 as EWL train service has resumed one day earlier than planned.


Find out more at 4 Day Closure on East West Line (Tanah Merah – Tampines) for Track Works

Details

Start:
December 7
End:
December 9
Event Categories:
,

Leave a Reply

Your email address will not be published. Required fields are marked *