
Opening of Pasir Ris Integrated Transport Hub
April 27

Pasir Ris Integrated Transport Hub will open on Sunday 27 April 2025.
All existing bus services at Pasir Ris Bus Interchange will move to the new Integrated Transport Hub.
The MINDEF Pick-Up Drop-Off Point will also be relocated to the new BMT @ Pasir Ris facility, connected to the Integrated Transport Hub.
Operator Poster
Reference
One thought on “Opening of Pasir Ris Integrated Transport Hub”
Leave a Reply
Same like Bedok I think hopefully parking lots also more