Loading Events

« All Events

  • This event has passed.

Sengkang LRT Maintenance Works (October 2019)

6 October 2019 @ 5:30 AM - 5:30 PM UTC+8

Sengkang LRT Stock Photo
Maintenance works on Sengkang LRT | Sunday, 6th October 2019
Train Service Operates: East Loop West Loop
Before 1730hrs Outer Loop (via SE1 Compassvale) Inner Loop (via SW1 Cheng Lim)
After 1730hrs Both Directions Both Directions

To facilitate asset renewal and maintenance works on the Sengkang LRT network, Train Services will only commence at 5:30 pm on Sunday, 6 October 2019 for the following LRT Services:

  •  Sengkang West LRT  via SW8 Renjong
    (West Loop Outer / Route A)
  •  Sengkang East LRT  via SE5 Ranggung
    (East Loop Inner / Route D)

Sengkang LRT Services will only operate via:

  • SW1 Cheng Lim on the  West Loop 
    (West Loop Inner / Route B)
  • SE1 Compassvale on the  East Loop  and;
    (East Loop Outer / Route C)

until 5:30 pm, when normal LRT services resume on both loops.

Main Article: Sengkang LRT Maintenance Works (June – October 2019)


Operator Poster

Details

Date:
6 October 2019
Time:
5:30 AM - 5:30 PM UTC+8
Event Category:

Leave a Reply

Your email address will not be published. Required fields are marked *