Refer to Page 1 of this article for the March – May 2021 version of Shuttle 3.
This page refers to the December 2017 version of Shuttle 3.
The Tuas Link—Joo Koon Shuttle Bus Service was a Rail Replacement Service plying between Tuas Link and Joo Koon, serving en-route East West Line (EWL) stations.
The route was activated to operate on selected Fridays, Saturdays and Sundays in December 2017, when shortened operating hours are implemented across sections of the NSL and EWL to facilitate more time for track maintenance and renewal work.
Technical Information | ||
Route |
Tuas West Dr (Tuas Link MRT) ↔ Joo Koon Circle (Joo Koon MRT) |
|
Passes Through | Tuas West Road, Tuas Crescent, Gul Circle MRT Stations | |
Route Length | TBC | |
Travelling Time | 25 mins | |
Operator Information | ||
BCM Route Package | Not Applicable | |
Operator | Tower Transit Singapore Pte Ltd | |
Depot | Bulim Bus Depot | |
Current Fleet | 12-metre Double Decker Bus – Volvo B9TL |
|
Departure Times from Joo Koon |
2240hrs – 0205hrs (Early Closure on Affected Fridays & Saturdays) 0527hrs – 0800hrs (Late Opening on Affected Saturdays & Sundays) 0527hrs – 0205hrs (Full Line Closure on Affected Sundays) |
|
Departure Times from Tuas Link |
2240hrs – 2320hrs (Early Closure on Affected Fridays & Saturdays) 0519hrs – 0800hrs (Late Opening on Affected Saturdays & Sundays) 0519hrs – 2320hrs (Full Line Closure on Affected Sundays) |
|
Frequency | Direction 1 | Direction 2 |
Peak Hours: 03 – 05 mins Off Peak Hours: 05 – 10 mins |
Peak Hours: 03 – 05 mins Off Peak Hours: 05 – 10 mins |
The Shuttle Bus Service will only operate on affected days in December. These Days are: 8, 9, 10, 15, 16, 17, 22, 23, 24, 29, 30 & 31 December.
- On days of Early Closure (8, 9, 15, 16, 22, 23, 29 & 30 Dec), buses will operate from the start time of the early closure till the stipulated last bus timings below.
- On days of Late Opening (9, 16, 23, 24, 30 & 31 Dec), buses will operate from the stipulated first bus timings below till the start time of normal train operations.
- The Shuttle Buses will operate for the entire day on Full Closure days (10 & 17 Dec).
Shuttle Bus Departure Timings from Stations
Also check out:
External Links & References:
- More Time for MRT Maintenance Work with Early Closure and Late Opening on NSEWL – SMRT
- More Shuttle Bus Services to Support Shortened East-West Line Operational Hours from 2 March to 1 April 2018 – SMRT
Back to East West Line Rail Bridging Service
Back to Rail Bridging Services
Back to Bus Services
Back to Bus Articles
Page 1: Shuttle 3 (Mar–May 2021) Route Information
Page 2: More Photos
Page 3: Shuttle 3 (Nov 2018) Route Information
Page 4: Shuttle 3 (Mar 2018) Route Information