Loading Events

« All Events

  • This event has passed.

Punggol LRT Maintenance Works (September 2020)

6 September 2020 @ 5:00 AM - 12:00 AM UTC+8

Punggol LRT System - Single versus Double carriage train
Maintenance works on Punggol LRT
Sunday, 6th September 2020
Train Service Operates: East Loop West Loop
Whole Day Inner Loop (via PE1 Cove) Outer Loop (via PW7 Soo Teck)

To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Services will be suspended on Sunday, 6 September 2020 for the following LRT Services (from Punggol Town Centre station):

  • Punggol West LRT  via PW1 Sam Kee
    (West Loop Inner / Route B)
  • Punggol East LRT via PE7 Damai
    (East Loop Outer / Route C)

Punggol LRT Service will only operate via (from Punggol Town Centre station):

  • PW7 Soo Teck on the West Loop  and;
    (West Loop Outer / Route A)
  • PE1 Cove on the East Loop
    (East Loop Inner / Route D)

Main Article: Sengkang & Punggol LRT Maintenance Works (July – September 2020)


Operator Poster

Details

Date:
6 September 2020
Time:
5:00 AM - 12:00 AM UTC+8
Event Categories:
,

Leave a Reply

Your email address will not be published. Required fields are marked *