Loading Events

« All Events

Punggol LRT Maintenance Works (September 2020)

September 6 @ 5:00 AM - 5:00 PM UTC+8

Punggol LRT System - Single versus Double carriage train
Maintenance works on Punggol LRT
Sunday, 6th September 2020
Train Service Operates: East Loop West Loop
Before 1700hrs Inner Loop (via PE1 Cove) Outer Loop (via PW7 Soo Teck)
After 1700hrs Both Directions Both Directions

To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Services will only commence at 5:00 pm on Sunday, 6 September 2020 for the following LRT Services (from Punggol Town Centre station):

  • Punggol West LRT  via PW1 Sam Kee
    (West Loop Inner / Route B)
  • Punggol East LRT via PE7 Soo Teck
    (East Loop Outer / Route C)

Punggol LRT Service will only operate via (from Punggol Town Centre station):

  • PW7 Soo Teck on the West Loop and;
    (West Loop Outer / Route A)
  • PE1 Cove on the East Loop
    (East Loop Inner / Route D)

until 5:00 pm, when normal LRT services resume on both loops.

Main Article: Sengkang & Punggol LRT Maintenance Works (July – September 2020)


Operator Poster

Details

Date:
September 6
Time:
5:00 AM - 5:00 PM UTC+8
Event Categories:
,

Leave a Reply

Your email address will not be published. Required fields are marked *