Jurong Lake District MRT Station

CR19
Jurong Lake District
CR19 Jurong Lake District Station Location Map (Image: LTA)
Address
Line Served   Cross Island Line
Operator TBC
Structure Underground
Platform TBC
Opening Year 2032

Jurong Lake District MRT Station (CR19) is an underground station along the Cross Island Line (CRL) Phase 2. The station is located in the upcoming Jurong Lake District, and serves as the western terminus for CRL Phase 2.

It is targeted for completion and opening in Year 2032.


First / Last Train Timings

Cross Island Line – (CR19) Jurong Lake District
Destination First Train Last Train
Weekdays Sat Sun &
PHs
Daily
CR2 Aviation Park

Train Services


Construction Trivia

Jurong Lake District Station will be constructed as part of Contract CR211 – Design and Construction of Jurong Lake District Station and Tunnels for Cross Island Line, which was awarded to KTC Civil Engineering & Construction Pte Ltd in July 2024 at a contract value of around S$590 million.


Gallery

External Links & References

Back to Cross Island Line

9 thoughts on “Jurong Lake District MRT Station

  • 2 January 2024 at 8:43 PM
    Permalink

    What is this location? They could have an interchange with JRL at Teban but now what? A station in the middle of nowhere?

    Reply
  • 23 September 2022 at 9:06 PM
    Permalink

    If They integrate the paid areas of both the Jurong Lake District MRT together with Jurong Town Hall MRT, then kudos to them!!!

    Reply
    • 28 September 2022 at 8:16 AM
      Permalink

      That will be the first time 2 separate stations have a paid link between them

      Reply
      • 30 September 2022 at 4:50 PM
        Permalink

        Concept is similar to Plaza Rakyat-Merdeka station complex.

        Reply
        • 2 October 2022 at 10:12 AM
          Permalink

          & Muzium Negara-KL Sentral Stesen Kompleks

          Reply
    • 1 October 2022 at 10:16 PM
      Permalink

      they could have more unpaid links. many stations are near each other. they should give people the option to tap out and walk to the station and count as a transfer if it is within the time limit. example being rochor & jalan besar (skip the DT1 loop), esplanade & city hall, marina south & marina south pier is literally side by side, bencoolen & bras basah etc

      Reply
      • 12 January 2024 at 12:28 PM
        Permalink

        Supposingly to hv the future high speed rail direct link from this Station Singapore to Kl Bandar Station for those who wanted to travel malaysia via trains. Ended up cancelled and revived the huge railway projects.

        Reply
  • 21 September 2022 at 7:38 PM
    Permalink

    i think people working in jurong will have a break taking the bus to jurong