Corporation MRT Station (JS5) is an elevated station located along the Jurong Region Line (JRL) Phase 1. It is built along Jurong West Avenue 2, near the junction with Corporation Road, bringing rail connectivity to schools, residential developments, community amenities and industries in the area.
The station is in the vicinity of schools such as Jurong-Pioneer Junior College; community amenities such as Choice Retreat House and Jurong West NPC; and residential developments around Jurong West Street 42. It will also support future developments in the Bulim area, currently under construction.
The station is targeted for completion and opening in Year 2027.
The opening was announced to be delayed by about one year in a Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line on 1 Feb 2021, with COVID-19 cited as a reason.
First / Last Train Timings
Jurong Region Line – (JS5) Corporation |
|||
---|---|---|---|
Destination | First Train | Last Train | |
Weekdays & Sat |
Sun & Public Holidays |
Daily | |
— | — | — | — |
— | — | — | — |
Train Services
Jurong Region Line (West) towards JW2 Tawas via JS6 Jurong West and JS8EW27 Boon Lay (→) Jurong Region Line (West) towards JS1NS4BP1 Choa Chu Kang via JS4 Hong Kah (←) |
Corporation station has two platforms in an island platform arrangement.
The station platforms are built to four-car length to cater for future expansion, although trains will only operate in a three-car formation.
Exits
Corporation MRT station will likely have three exits (originally planned with 4) leading to ground level. More details will be confirmed closer to the opening of the station.
Construction Trivia
Corporation Station will be constructed as part of Contract J103 – Design and Construction of Hong Kah Station, Corporation Station and Viaduct for Jurong Region Line, which was awarded to Eng Lee Engineering Pte Ltd – Wai Fong Construction Pte Ltd Joint Venture at a contract value of $274.3 million in September 2019.
Gallery
External Links & References
- Jurong Region Line – LTA
- LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line – LTA
- Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line – Ministry of Transport
Back to Jurong Region Line
Back to Trains
Corporation MRT Station should be ready by 2027.
HI, does anyone know if Corporation station will be underground or surface ones ?
The website states that it is an elevated structure i.e. above ground. All JRL stations should be above ground