Single Loop Operations on Sengkang LRT West Loop (Apr – Oct 2026)
The West Inner Loop of the Sengkang LRT Line will be closed from 19 April 2026 to 18 October 2026.
Read moreThe West Inner Loop of the Sengkang LRT Line will be closed from 19 April 2026 to 18 October 2026.
Read moreCivil contracts for the construction of the Downtown Line Stage 2 Extension (DTL2e) were awarded by the Land Transport Authority
Read moreThe renewal of Singapore’s North East Line (NEL) power supply system is scheduled to begin in 2026. This news follows the
Read moreThis article summarises the findings of the Rail Reliability Taskforce, which was convened on 19 September 2025 to develop and
Read moreThe Singapore Airshow 2026 was held from 3 to 8 February 2026. Returning for its tenth installment, the biennial event,
Read moreSBS Transit Bus Service 18M is an interim supplementary trunk service plying from Bedok North Bus Depot and looping at
Read moreA Shuttle Bus between Airport Logistics Park of Singapore (ALPS) and Changi Village will operate from 31 January to 11 February 2026,
Read moreZhongtong N12 electric buses under SMRT Buses were suspended from passenger service on 28 January 2026. These buses operate out
Read moreThe site of a new Integrated Transport Hub (ITH) at Hougang Central was awarded to a CapitaLand-led consortium on 14
Read moreGo-Ahead Singapore will soon operate Volvo B5LH and ADL Enviro500 (3-door) buses. With six months remaining before the scheduled commencement
Read more