SBS Transit Bus Service 146 is a trunk service operating between Woodleigh and Bartley Road, serving the new residential estates within Bidadari.
Service 146 will be extended to loop at Kovan MRT & Kovan Hub from 14 Dec 2025.
| Route Overview | ||||||||||||
| Route |
Woodleigh Bus Interchange ↔ Bartley Road [From 14 Dec 2025] Woodleigh Bus Interchange ↺ Hougang Street 21 (Loop) |
|||||||||||
| Passes Through | Upper Serangoon Road | |||||||||||
| Route Length | Towards Bartley Rd: 3.1 km | Towards Woodleigh: 3.4 km | ||||||||||
| Travelling Time | 15 mins | |||||||||||
| Operator Information | ||||||||||||
| BCM Route Package | Serangoon–Eunos Bus Package | |||||||||||
| Current Operator | SBS Transit Ltd | |||||||||||
| Current Depot | Hougang Bus Depot (HGDEP) | |||||||||||
| Current Fleet | Single-deck buses | |||||||||||
| Operating Hours | ||||||||||||
| Departure Times from Woodleigh |
Daily | |||||||||||
| 06:00 – 00:00 | ||||||||||||
| [Till 13 Dec 2025] Departure Times from Bartley Rd (Aft Upp Paya Lebar Rd) |
Daily | |||||||||||
| 06:00 – 00:00 | ||||||||||||
| Operating Frequency | ||||||||||||
| From Woodleigh | 6:30am–8.30am | 8.31am–4.59pm | 5.00pm–7.00pm | After 7.00pm | ||||||||
| Weekdays | 12 mins | 15 mins | 12 – 15 mins | 12 – 15 mins | ||||||||
| Saturdays | 15 mins | 15 mins | 15 mins | 15 mins | ||||||||
| Sundays / Public Holidays | 15 mins | 15 mins | 15 mins | 15 mins | ||||||||
| [Till 13 Dec 2025] From Bartley Road |
6:30am–8.30am | 8.31am–4.59pm | 5.00pm–7.00pm | After 7.00pm | ||||||||
| Weekdays | 12 mins | 15 mins | 12 – 15 mins | 12 – 15 mins | ||||||||
| Saturdays | 15 mins | 14 – 15 mins | 15 mins | 15 – 16 mins | ||||||||
| Sundays / Public Holidays | 15 mins | 14 – 15 mins | 15 mins | 15 – 16 mins | ||||||||
| Fare Information |
||||||||||||
| Fare | Charges regular distance fares |
|||||||||||
Bus Service 146 serves new housing estates in Bidadari, connecting them to the nearby Bartley and Woodleigh MRT stations, as well as amenities such as The Woodleigh Mall.
Within Bidadari town, the service serves the new housing estates such as:
- Woodleigh Hillside
- Woodleigh Glen
- Woodleigh Village
- Alkaff Courtview
- Alkaff Oasis
- Alkaff Lakeview
At launch, the route started and ended at pair of bus stops along Bartley Road (start: Aft Upp Paya Lebar Rd; end: Bef Upp Paya Lebar Rd) while looping at Bidadari Park Drive with buses performing layovers at Hougang Bus Depot. With the opening of Woodleigh Integrated Transport Hub on 20 Apr 2025, the route was amended to be a bi-directional service from both Woodleigh Bus Interchange and Bartley Road.
Under the Land Transport Authority’s Bus Connectivity Enhancement Programme (BCEP), the service would be extended to loop at Hougang Street 21 (Kovan Hub) from 14 December 2025, via Hougang Ave 3, Hougang Close, Hougang Ave 1, Tampines Rd and Kovan MRT Station.
Future Plans
With the extension of Service 146 to loop at Hougang St 21 in December 2025, 2 pairs of new bus stops are planned to be served by Service 146 in the future. These are:
- 1 pair along Hougang Close
- 1 pair along Hougang Ave 1
MRT Stations Served
Special Departures
[From 14 Dec 2025]
- Hougang St 13 (Blk 181) → Woodleigh Int via Hougang St 21
Daily from 05:25 till first bus from Woodleigh Int
Gallery
Operator Posters
Operator History:
- 25 Feb 2024 – Present: SBS Transit Ltd
Route History:
- 2024 (25 Feb): Introduced between Bartley Road and Bidadari Park Drive (Loop)
- 2025 (20 Apr): Extended to Woodleigh Integrated Transport Hub; Amended to be a bi-directional service between Woodleigh Bus Interchange and Bartley Road
- 2025 (14 Dec): Extended to loop at Hougang St 21 under the LTA’s Bus Connectivity Enhancement Programme (BCEP).
Back to Bus Services












115 loadings drop, 53M up
146 should go to Defu Avenue 1
3km only…. So short
remember that it will extend further to serve hougang ave 3
How long more ah
When Hougang st 12 and Hougang ave 13 are completed
Routing looks so cooked up. Another Service 992 lookalike routing for now.
At least 992 has healthy loadings compared to this shit… Should extend to serve 115 routes and withdraw that 115..give that 115 to other bus package in future.
You can never merge any service with 115 unless the route plies from Upp Serangoon Rd northbound. 146 comes from the south, making it impossible to effectively absorb 115
146 will only ply Hg Ave 1 north to loop at Kovan. That is probably it