Loading Events

« All Events

  • This event has passed.

MRT Early Closure: Tanah Merah – Pasir Ris (6 – 7 Dec)

6 December 2019 @ 11:30 PM - 8 December 2019 @ 1:30 AM UTC+8

Shorter operating hours along the East West Line (EWL) between Tanah Merah and Pasir Ris will take place on selected Fridays & Saturdays in December 2019 to facilitate additional engineering hours for installation of 22kV power cables as part of power supply system renewal works.

This will involve early closures along the EWL

Affected Train Stations

Train services between Tanah Merah – Pasir Ris on the East West Line will:

  • End earlier at around 11.00pm on Friday, 6 December 2019 & Saturday, 7 December 2019

Find out more (including affected train timings) at Early Closure of East West Line (December 2019)

Train Service will only operate between EW4CG Tanah MerahEW33 Tuas Link and EW4CG Tanah MerahCG2 Changi Airport during the periods of closure.

A Shuttle Bus Service will be available:


Extended Bus Operating Hours

During of Early Closure, the last buses for residential bus services will be extended to allow commuters to connect from the Shuttle Bus Services.

  • Tampines
    Bus Services 291, 292 & 293
    Last bus at 1:10am
  • Pasir Ris
    Bus Services 358 & 359
    Last bus at 1:20am

 

Details

Start:
6 December 2019 @ 11:30 PM UTC+8
End:
8 December 2019 @ 1:30 AM UTC+8
Event Categories:
,

One thought on “MRT Early Closure: Tanah Merah – Pasir Ris (6 – 7 Dec)

  • 24 October 2019 at 9:30 PM
    Permalink

    Will train service run through to Changi Airport during those hours or is that just a pipe dream?

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *