Bus Rapid Transit system for Tuas South under study
The Land Transport Authority (LTA) will study the feasibility of introducing a Bus Rapid Transit (BRT) system in Tuas South,
Read moreThe Land Transport Authority (LTA) will study the feasibility of introducing a Bus Rapid Transit (BRT) system in Tuas South,
Read moreA second rail depot for the Cross Island Line (CRL) will be built as part of CRL Phase 3, as
Read moreOn 16 July 2026, the Land Transport Authority (LTA) announced the awarding of the Serangoon–Eunos Bus Package to SMRT Buses.
Read moreTower Transit Bus Service 461 is a limited-stop bus service introduced under the Land Transport Authority’s Bus Connectivity Enhancement Programme
Read moreTower Transit unveiled Singapore’s first Wedding Bus at its TTS10 Open House Carnival on 27 June 2026, held at Bulim Bus
Read moreThe Tampines Bus Package will be progressively taken over by Go-Ahead Singapore in July 2026. The transfer of bus services
Read moreBYD B70A02 Manufacturer BYD Auto Bodywork Zhuhai Guangtong Years in operation (Upcoming) 2026– Operator SBS Transit (Upcoming) Technical Data Length
Read moreSBS Transit Bus Service 807C is a Short-Trip Service variant of Bus Service 807. The route operates from Khatib MRT
Read moreWaiting at the bus stop not knowing when the bus will come? The Land Transport Authority’s (LTA) real-time bus arrival
Read moreBus Service WTS9 is a cross-border bus service connecting Changi Airport in Singapore and Taman Ungku Tun Aminah (TUTA) in
Read more