CRRC eD12 MAX (LTA PT602 Production Batch)
CRRC eD12 MAX Manufacturer CRRC Electric Bodywork Gemilang Coachworks Years in operation 2026— (Expected) Operators TBA Technical Data Length 12
Read moreCRRC eD12 MAX Manufacturer CRRC Electric Bodywork Gemilang Coachworks Years in operation 2026— (Expected) Operators TBA Technical Data Length 12
Read more3-door BYD electric bus. 160 units ordered by Singapore’s LTA under Contract PT602 (SG3621B – SG3780A), entering service in late 2026.
Read more3-door electric single-deck bus. 100 units ordered by Singapore’s LTA under Contract PT602 (SG3521G – SG3620D), entering service in late 2026.
Read more3-door electric double-deck bus. 50 units ordered by Singapore’s LTA under Contract PT602 (SG7160M–SG7209H), entering service in late 2026.
Read moreThe Land Transport Authority (LTA) has cancelled plans to deploy autonomous public buses on Bus Services 191 and 400. The
Read moreIn October 2026, new details on Singapore’s Bus Contracting Model (BCM) were disclosed in several written parliamentary replies issued by
Read moreTower Transit Bus Service 861C is a Short-Trip Service variant of Bus Service 861. The route plies from Sembawang Int
Read moreService 968 is an upcoming bus service operating from Woodlands Temporary Bus Interchange to support the opening of the RTS
Read moreTower Transit Bus Service 873M is a trunk service operating from Tengah and looping at Bukit Batok Street 52, connecting
Read moreTower Transit Bus Service 873 is a trunk service operating from Tengah and looping at Hume MRT Station, connecting Tengah
Read more