Alstom Metropolis C851E (North East Line)
Alstom Metropolis C851E (NEL) In service 2023 – Manufacturer Alstom Constructed Barcelona, Spain Number built 36 Vehicles (6 trainsets) Formation
Read moreAlstom Metropolis C851E (NEL) In service 2023 – Manufacturer Alstom Constructed Barcelona, Spain Number built 36 Vehicles (6 trainsets) Formation
Read moreContract 851E (NEL) In service 2023 Manufacturer Alstom Constructed Barcelona, Spain Number built 36 Vehicles (6 trainsets) Formation 6 cars
Read moreThe Mitsubishi Crystal Mover (C810) is a rubber-tyred automated people mover (APM) train operating on the Sengkang LRT (SKLRT) and Punggol LRT (PGLRT). Entering service in June 2003 on the Sengkang LRT’s East Loop, these were the Sengkang & Punggol LRT Line’s first generation of rolling stock.
Read moreThe Bombardier Innovia APM 100 (C801) is a rubber-tyred automated people mover (APM) train operating on the Bukit Panjang LRT (BPLRT). Entering service in 1999, these were the Bukit Panjang LRT Line’s first generation of rolling stock, and are capable of operating in single and double car formations.
Read moreThe Kawasaki Heavy Industries C151 is an electric multiple unit (EMU) train operating on the North South Line (NSL) and East West Line (EWL). Entering service in 1987 in tandem with the opening of Singapore’s Mass Rapid Transit (MRT) system, these trains are the oldest rolling stock in operation.
Read moreBombardier MOVIA C951 In service December 2013 – Present Manufacturer Changchun Bombardier Railway Vehicles Constructed 2012 – 2016 Number built 276
Read moreBombardier Innovia APM100 (C801A) In service November 2014 – Present Manufacturer Bombardier Transportation Constructed 2014 – 2015 Number built 13 Vehicles (13 trainsets)
Read moreThe Alstom Metropolis C830 is an electric multiple unit (EMU) train operating on the Circle Line (CCL). Entering service in 2009, these were the Circle Line’s first generation of rolling stock.
Read moreThe Kawasaki Heavy Industries & CSR Qingdao Sifang C151A is an electric multiple unit (EMU) train operating on the North South Line (NSL) and East West Line (EWL). Entering service in 2011, these were the fourth generation of rolling stock, purchased to increase the capacity of both lines by 15%.
Read moreThe Kawasaki Heavy Industries & Nippon Sharyo C751B is an electric multiple unit (EMU) train operating on the North South Line (NSL) and East West Line (EWL). Entering service in 2000, these were the third generation of rolling stock, purchased ahead of the opening of the EWL’s Changi Airport Branch Line in 2001/ 2002.
Read more