Loading Events

« All Events

  • This event has passed.

Sengkang LRT Maintenance Works (23-24 Jan)

23 January 2021 - 24 January 2021

Sengkang LRT Stock Photo
Maintenance works on Sengkang LRT
Saturday, 23 January 2021 &
Sunday, 24 January 2021
Train Service
East Loop West Loop
Suspended Outer Loop (via SE1 Compassvale) Inner Loop (via SW1 Cheng Lim)
In Operation Inner Loop (via SE5 Ranggung) Outer Loop (via SW8 Renjong)

To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Service will be suspended for the following LRT Services (from Sengkang Town Centre station):

  • Sengkang West LRT  via SW1 Cheng Lim
    (West Loop Inner / Route B)
  • Sengkang East LRT  via SE1 Compassvale
    (East Loop Outer / Route C)

Sengkang LRT Service will only operate via (from Sengkang Town Centre station):

  • SW8 Renjong on the West Loop  and;
    (West Loop Outer / Route A)
  • SE5 Ranggung on the East Loop
    (East Loop Inner / Route D)

on Saturday, 23 January 2021 & Sunday, 24 January 2021.

Main Article: Sengkang & Punggol LRT Maintenance Works (December 2020 – March 2021)


Operator Poster

Details

Start:
23 January 2021
End:
24 January 2021
Event Category:

Leave a Reply

Your email address will not be published. Required fields are marked *