EWL Train Disruption due to Power Fault (Sep 2024)

On 25 September 2024, a major train disruption occurred on the East West Line (EWL).

The disruption started at around 9.25am when train service between EW19 Queenstown & EW27 Boon Lay were disrupted due to a Power Fault.

Partial resumption of EWL train service started later that day at around 4.42pm, using shuttle trains along two sectors: between EW19 Queenstown & EW21CC22 Buona Vista, as well as between EW27 Boon Lay and EW24NS1 Jurong East.

EWL train service between EW21CC22 Buona Vista & EW24NS1 Jurong East will continue to be disrupted on Thursday, 26 September 2024. This is to allow engineers more time to work overnight on essential repairs and replacements due to extensive damage to the tracks.


Timeline – 25 September 2024
  • Around 0900hrs – a first-generation Kawasaki Heavy Industries train developed a fault while travelling eastbound on EWL near Clementi station. SMRT detrained passengers at Clementi station, and proceeded to withdraw the train towards Ulu Pandan depot.
  • At 0925hrs – a power trip was detected while the train was being withdrawn, causing trains on the EWL between Queenstown and Boon Lay stations to stall.
    This was later attributed to a defective train axle box on a first-generation train which dropped and caused the wheels of a bogie to come off the running rail and hit track equipment, including the third rail and point machines, leading to the power fault.
  • 0928hrs – free regular bus services activated at affected stations between Boon Lay and Queenstown.
  • 0946hrs – free bridging bus services activated at affected stations between Boon Lay and Queenstown.
  • 0952hrs – SMRT informs commuters via its official social media platforms (Facebook / X, formerly Twitter) that there is no train service between Boon Lay and Queenstown due to a traction power fault and that free regular bus services are available between Boon Lay and Queenstown.
  • 0956hrs – SMRT informs commuters via its official social media platforms that free bridging bus services & free regular bus services are available between Boon Lay and Queenstown.
  • 1443hrs – Announcement on SMRT official social media platforms that shuttle train services at 10 mins interval between Queenstown and Buona Vista as well as between Boon Lay and Jurong East will begin at 5pm till end of service
  • 1642hrs – Train service disruption revised to be between Jurong East and Buona Vista
  • 2000hrs – Free bridging bus services revised to operated only between Jurong East and Buona Vista
  • 2120hrs – Announcement on SMRT official social media platforms that train service between Jurong East and Buona Vista will continue to be disrupted on 26 Sep 2024 as engineers will be working through the night and throughout the next day (26 Sep) to restore service on the affected sector where point machines and the third rail have been damaged.

The affected train was trainset 065/066, a first-generation Kawasaki Heavy Industries C151 train. One bogie of Car 2065 had derailed near Ulu Pandan Train Depot.


Affected MRT Stations

Modified EWL Train Services
Wed 25 Sep 2024

From around 9:25am to before 5:00pm:

  • No EWL train service between EW19 Queenstown & EW27 Boon Lay

After 5:00pm to end of service:

  • No EWL train service between EW21CC22 Buona Vista & EW24NS1 Jurong East
  • Shuttle train service commenced at about 5:00pm, operating at 10 mins interval between:
    EW27 Boon Lay EW24NS1 Jurong East &
    EW21CC22 Buona VistaEW19 Queenstown
    (Last shuttle train from Boon Lay connecting to last eastbound train at Queenstown departs at 2249hrs;
    Last shuttle train from Queenstown connecting to last westbound train at Boon Lay departs at 2325hrs)

Thu 26 Sep 2024

From start of service:

  • No EWL train service between EW21CC22 Buona Vista & EW24NS1 Jurong East
  • Shuttle train service, operating at 10 mins interval between:
    EW27 Boon Lay EW24NS1 Jurong East &
    EW21CC22 Buona VistaEW19 Queenstown

Bridging Buses & Free Regular Buses
Wed 25 Sep 2024

Free Regular Bus Services & EWL Bridging Buses were activated between EW19 Queenstown and EW27 Boon Lay stations at 0928hrs & 0946hrs respectively.

Bridging buses were operated by Tower Transit between Boon Lay & Buona Vista, while SBS Transit operated between Boon Lay & Queenstown. Later in the evening, Tower Transit bridging buses were no longer observed to be running, while SMRT Buses also operated the bridging bus service between Boon Lay & Queenstown.

At 2000hrs, the free bridging bus service was revised to operate only between EW24NS1 Jurong East & EW21CC22 Buona Vista.

Thu 26 Sep 2024

For Thursday, 26 September 2024;

  • Free Regular Bus Services will be available between EW19 Queenstown and EW27 Boon Lay
  • Free Bridging Bus Services (EWL Bridging Buses) will be available between EW24NS1 Jurong East & EW21CC22 Buona Vista

References

Leave a Reply

Your email address will not be published. Required fields are marked *