MRT Closure: Tanah Merah – Tampines (7–10 Dec)
December 7 - December 10
A series of works to facilitate the connection of tracks from the existing East-West Line to the East Coast Integrated Depot in preparation for its opening in 2026 will take place from Saturday 7 December 2024 to Tuesday 10 December 2024.
As a result, there will be no train service on the East West Line between Tanah Merah and Tampines.
Shuttle train services will be operated as well.
Adjusted Train Services
- No Train Service between:
EW2–DT32 Tampines – EW4CG Tanah Merah - Shuttle Train Services will operate between:
EW1 Pasir Ris – EW2–DT32 Tampines (5 min frequency)
EW4CG Tanah Merah – CG1DT35 Expo (8 min frequency)
CG1DT35 Expo – CG2 Changi Airport (11 min frequency)
Affected Train Stations
- EW1 Pasir Ris
- EW2–DT32 Tampines
- EW3 Simei
- EW4CG Tanah Merah
- CG1DT35 Expo
- CG2 Changi Airport
Shuttle Bus Service
A Shuttle Bus Service will be available from Saturday, 7 December 2024 to Tuesday, 10 December 2024.
Find out more at 4 Day Closure on East West Line (Tanah Merah – Tampines) for Track Works