LRT Single Loop Closure: Sengkang West Inner Loop (19 Apr – 18 Oct)
April 19 - October 18

A series of works will take place on the Sengkang LRT Line (SKLRT) from Sunday 19 April 2026 to Sunday 18 October 2026.
These works are to connect new reception tracks from the expanded Sengkang LRT Depot to the existing mainline, which involves:
- Heavy modification of the existing track
- Connect the new reception tracks to existing track,
- Installation and testing of signalling systems and equipment
As a result, there will be no train service on the Sengkang LRT West Inner Loop (Sengkang → Cheng Lim → Renjong → Sengkang).
More, including train service arrangements & shuttle bus services at: