| CR22 | |
| Address | along Gul Circle |
| Line Served | Cross Island Line |
| Operator | (TBC) |
| Structure | Underground |
| Platform | (TBC) |
| Opening | Late 2030s |
CR22 MRT Station is an underground station along the Cross Island Line (CRL) Phase 3. The station is located at the eastern part of Gul Circle, near the junction with Gul Way. The station would serve the industries in the Gul area.
It is targeted for completion and opening in the late 2030s.
Train Services
- Eastbound: Towards CR1TE32 Changi Terminal 5 via CR21JS12 Jurong Pier
- Westbound: Towards CR23EW30 Gul Circle
The station platforms are built to eight-car length to cater for future expansion, although trains will only operate in a six-car formation.
Gallery
External Links & References
- Joint News Release by the Land Transport Authority (LTA) & SLA – Cross Island Line Phase 3 to Connect Jurong Lake District to Gul Circle with Four New Stations – Land Transport Authority [31 Jul 2026]
Back to Cross Island Line
