EW10 Kallang å å· | ą®ą®¾ą®²ą®¾ą®ąÆ |
|
Address | 5 Sims Avenue, Singapore 387405 |
Line Served | Ā East West Line |
Operator | SMRT Trains |
Structure | Elevated |
Platform | Island |
Opened | 4 Nov 1989 |
Kallang MRT Station (EW10) is an above-groundĀ station along theĀ East West Line (EWL). It is located along Sims Avenue, at the junction with Lorong 1 Geylang.
The station is named after the Kallang area it serves, thought to be derived from factory mills or the Orang Laut tribe in the past.Ā It servesĀ clusters of HDB housing blocks around Lorong 1 Geylang, alongĀ with plenty of businesses and institutions located within shophouses in theĀ Sims Avenue / Geylang Road area, and industrialĀ estates in the Boon Keng area.
Bus connections are offered fromĀ Lorong 1 Geylang Bus Terminal, heading to other parts of the island.
First / Last Train Timings
East West Line – (EW10) Kallang |
|||
Destination | First Train | Last Train | |
Weekdays & Sat | Sun & Public Holidays | Daily | |
EW1 Pasir Ris | 6:07am | 6:35am | 12:17am |
Connecting to CG2 Changi Airport | – | – | 11:33pm |
EW33 Tuas Link | 5:51am | 6:17am | 11:48pm |
Station Layout
L2 | Platform A | East West Line towards EW1Ā Pasir Ris |
PlatformĀ B | East West Line towards EW33 Ā Tuas Link | |
L1 | Ticket Concourse | Faregates, Ticketing Service Kiosks, Passenger Service Centre, Retail Shops |
Street Level | Bus stops, Taxi stand, pick-up/drop-off point, Station exits |
Platforms
East-West Line (L2):
Platform A: East West Line towards EW1Ā Pasir Ris via EW9 AljuniedĀ (ā) Platform B: East West Line towards EW33Ā Tuas Link via EW11Ā LavenderĀ (ā) |
Kallang station has two elevatedĀ East-West LineĀ platforms in an island platform arrangement.
Concourse
The station has a ticketĀ concourse located at ground level.
Station Amenities
- Retail shops and Public toilets at Concourse level (unpaid areas)
- ATMs and Self-service machines at Concourse level (unpaid areas)
- Bicycle racks at station exits
Exits
Kallang MRT station has two exits on the north and south side of the station. Passengers for Lorong 1 Geylang Bus TerminalĀ should use Exit A.
Exit | Location | Nearby |
A | Sims Avenue | Sims Avenue, Lorong 1 Geylang Bus Terminal, Geylang Road, Sheltered walkwayĀ to Nicoll Highway and Singapore Sports Hub |
B | Lorong 1 Geylang | Lorong 1 Geylang, Boon Keng Road, Geylang West Community Centre, Kallang Park Connector, Kallang Sector Industrial Estate, Kallang Distripark, Sims Avenue Industrial Estate, HDB Kallang Heights, HDB Kallang Trivista, HDB Boon Keng Ville |
Transport Connections
Kallang station connects to a bus terminal and several bus stops in the vicinity.
Bus
There is a bus terminal and fourĀ official bus stops linked to Kallang station. Passengers forĀ Lorong 1 Geylang Bus TerminalĀ should use Exit A and cross the road.
No. | Bus stop | Exit | Bus Routes |
Lorong 1 Geylang Bus Terminal | A | 11, 140, 141, 175, 853, 961, 961M, 980, 985 | |
B/sĀ 1 | 80031 – Sims Ave (KallangĀ Stn) | A | 2, 7, 12, 13, 32, 33, 51, 63, 67, 80, 100, 197 |
B/sĀ 2 | 80039 – Geylang Rd (Opp Lor 1 Geylang Ter) | A | 2, 7, 7A, 12, 13, 32, 33, 51, 63, 63A, 67, 80, 100, 197 |
B/sĀ 3 | 80101 – Lor 1 Geylang (Kallang Stn/Opp Blk 2C) | B | 21, 21A, 26, 31, 140, 175, 853, 853M, 961, 961M, 985 |
B/s 4 | 80109 – Lor 1 Geylang (Opp Kallang Stn/Blk 2C) | B | 21, 26, 31, 140, 175, 853, 853M, 961, 961M, 985 |
MRT Bus Bridging Service
In the event of a MRT service disruption affecting Kallang station, MRT Bridging Buses may be activated to ply affected stretches of the East West Line. In which case, the buses can be boarded from the following bus stops:
Towards | Bus stop | Exit | |
East West Line (EWL Bridging Bus) |
|||
EW1Ā Pasir Ris | B/s 1: 80031 – Sims Ave (KallangĀ Stn) | A | |
EW33Ā Tuas Link | B/s 2: 80039 – Geylang Rd (Opp Lor 1 Geylang Ter) | A |
In addition, passengers can board free regular bus services at Lorong 1 Geylang Bus Terminal, as well as Bus Stops 1 & 2 when activated.
Passenger Usage Patterns
Serving residential developments and businesses in the Kallang and Upper Boon KengĀ areas, the station encounters moderateĀ demand throughout the day.
Construction
—
Brief History
KallangĀ station opened on 4 November 1989 along with all other EWL stations fromĀ Bugis toĀ Tanah Merah.
Major Incidents
On 25 February 2021, a 31-year-oldĀ man died after he was run over by a train at the tunnel portal between Kallang and Lavender on the east bound track.
Gallery
External Links & References
- —