JS4 Hong Kah |
|
— | |
Address | 31 Tengah Garden Avenue, Singapore 699914 |
Line Served | Jurong Region Line |
Operator | Singapore One Rail |
Structure | Elevated |
Platform | Island |
Opening | Year 2027 |
Hong Kah MRT Station (JS4) is an elevated station located along the Jurong Region Line (JRL) Phase 1. It sited within the upcoming Tengah estate, along Tengah Garden Avenue, bringing rail connectivity to schools, residential developments and community amenities in the area.
The station is targeted for completion and opening in Year 2027.
The opening was announced to be delayed by about one year in a Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line on 1 Feb 2021, with COVID-19 cited as a reason.
First / Last Train Timings
Jurong Region Line – (JS4) Hong Kah |
|||
---|---|---|---|
Destination | First Train | Last Train | |
Weekdays & Sat |
Sun & Public Holidays |
Daily | |
— | — | — | — |
— | — | — | — |
Train Services
Jurong Region Line (West) towards JW2 Tawas via JS5 Corporation and JS8EW27 Boon Lay (→) Jurong Region Line (West) towards JS1NS4BP1 Choa Chu Kang via JS3 Tengah (←) |
Hong Kah station has two platforms in an island platform arrangement. A reception track connects Tengah Train Depot with the Jurong Region Line.
The station platforms are built to four-car length to cater for future expansion, although trains will only operate in a three-car formation.
Exits
Hong Kah MRT station will have three exits leading to ground level. More details will be confirmed closer to the opening of the station.
Construction Trivia
Hong Kah Station will be constructed as part of Contract J103 – Design and Construction of Hong Kah Station, Corporation Station and Viaduct for Jurong Region Line, which was awarded to Eng Lee Engineering Pte Ltd – Wai Fong Construction Pte Ltd Joint Venture at a contract value of $274.3 million in September 2019.
Gallery
External Links & References
- Jurong Region Line – LTA
- LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line – LTA
- Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line – Ministry of Transport
- Work Commences for Jurong Region Line – LTA
Back to Jurong Region Line
Back to Trains