Bukit Chagar RTS Station is an above-ground station and the Malaysian terminus of the Singapore–Johor Bahru RTS Link, currently under construction.

Bukit Chagar station and its adjacent ICQ complex are a part of the Southern Integrated Gateway, the main transportation hub of Johor Bahru which also includes Sultan Iskandar CIQ Complex and Johor Bahru Sentral railway station. A mixed development (including an integrated transport hub) is also being planned directly adjacent to Bukit Chagar station, but as a private development unaffiliated with the RTS Link project.


Indicative Platform Layout
Alighting only
MRT_rail (1)
Singapore–Johor Bahru RTS Link towards Woodlands North (Singapore) (→)
MRT_rail (1)
Alighting only

Platforms at Bukit Chagar station will be based on the Spanish solution, with a central platform for boarding passengers, and two side platforms for alighting passengers.


Departure Flow (towards Woodlands North, Singapore)

Passengers heading towards Singapore would have cleared both Malaysia & Singapore customs at the adjacent Bukit Chagar ICQ building before entering the station. The boarding platform serves trains on both sides.

Arrival Flow (from Woodlands North, Singapore)

Passengers arriving from Singapore would have already cleared both Singapore & Malaysia customs at Woodlands North, and can directly exit the station upon alighting from the train.

Operating Hours

Train service operating hours are between 6:00 am and midnight, with the option of starting earlier (at around 5:30 am) should there be passenger demand for it.


Station Amenities

  • To Be Confirmed

Exits

  • To Be Confirmed

Transport Connections

Various forms of road and rail transport connections are offered in the vicinity of Bukit Chagar station. The adjacent integrated transport hub is still under planning and will not be addressed in this section.

Rail

Inter-city rail services are operated by Keretapi Tanah Melayu (KTM) from the nearby Johor Bahru Sentral railway station, the Southern terminus of KTM’s West Coast Line.

Current train departures from Johor Bahru Sentral (as of October 2024):

  • Ekspres Rakyat Timuran to Tumpat: 1 daily service
  • Ekspres Selatan to Gemas: 3 daily services
  • Shuttle Tebrau to Woodlands: 18 daily services

The Shuttle Tebrau between Woodlands-Johor Bahru will cease six months after RTS Link passenger service begins.

Train services from Johor Bahru Sentral are expected to be improved with the Gemas-Johor Bahru Electrified Double-Tracking Project (EDTP), scheduled for completion in 2025.

Bus

Local bus services are offered from the nearby JB Sentral Bus Terminal. A proposed bus rapid transit (BRT) system, called the Iskandar Malaysia Bus Rapid Transit, is being planned.

Road

Taxi stands and pick-up/drop-off points are located near station exits. Exact locations are to be confirmed.


Gallery:
Construction Progress

 


External Links & References

3 thoughts on “Bukit Chagar RTS Link Station

  • 7 December 2023 at 11:13 AM
    Permalink

    Bukit Chagar could use a bus interchange exclusively for the sg cross border services (to save up space in the JB Sentral ter.)
    Bus services here are 160, 170, 170X, 950, 977, and AC7.

    160 and 950 will just be converted into bidirectional services with no major route changes apart from the interchange relocation. 160 will also transfer operator to tts under bulim bcm.
    170 would be shortened to this interchange.
    170X will start from this interchange, loop at kranji loop and be renumbered to bus 404 under smrt (woodlands bcm).
    AC7 will extend to this interchange and renumbered to 861 under tower transit (smb-yis bcm)
    977 is a new service from bukit panjang int operated by smrt.

    Reply
  • 1 December 2020 at 6:26 AM
    Permalink

    160,170X,950 and probably AC7 will be terminating here instead of JB Sentral.AC7 renumbered as 870 give it to Yishun anchor operator.

    Reply
  • 23 November 2020 at 7:38 PM
    Permalink

    Imagine what if 160 or 950 get extended to serve this new RTS stn.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *