Jurong Hill MRT Station

JS11
Jurong Hill
Lines Served   Jurong Region Line
Operator TBC
Structure Elevated
Platform Side
Opening Year 2028

Jurong Hill MRT Station (JS11) is an elevated station located along the Jurong Region Line (JRL) Phase 3. It is built along Jurong Pier Road, near the junction with Jalan Pesawat, bringing rail connectivity to Jurong Hill Park and industrial buildings in the area.

The station is targeted for completion and opening in Year 2028.


First / Last Train Timings

Jurong Region Line – JS11 Jurong Hill
Destination First Train Last Train
Weekdays
& Sat
Sun &
Public Holidays
Daily

Train Services

Jurong Hill station has two platforms in a side platform arrangement.

The station platforms are built to four-car length to cater for future expansion, although trains will only operate in a three-car formation.

Exits

Jurong Hill MRT station will likely have four exits leading to ground level. More details will be confirmed closer to the opening of the station.


Passenger Usage Patterns

Construction Trivia

Jurong Hill Station will be constructed as part of Contract J112Design and Construction of Jurong Hill Station, Jurong Pier Station and Viaduct for Jurong Region Line.

Future Developments


Major Incidents


Gallery


External Links & References

Back to Jurong Region Line
Back to Trains

Leave a Reply

Your email address will not be published. Required fields are marked *