Sengkang West Bus Depot

Sengkang West Bus Depot is a new multi-storey bus depot along Seletar West Road 1. The five-storey bus depot is Singapore’s first depot outfitted to support the large-scale deployment of electric buses, and includes on-site staff quarters that provide accommodation for transport workers.

The depot was handed over to SBS Transit in August 2024. Bus operations based at Sengkang West are expected to begin in early 2025.


General Information
Name Sengkang West Bus Depot
Address 8 Seletar West Road 1, Singapore 798990 /
12 Seletar West Road 2, Singapore 798989
Depot Information
BCM Route Package Sengkang–Hougang Bus Package
Anchor Operator SBS Transit
Years In Operation From 2025
Catchment Hougang, Sengkang, Compassvale
Introduction

Sengkang West Bus Depot is the fifth bus depot (after Ulu Pandan Bus Depot) that the Land Transport Authority (LTA) developed and funded, as well as the second multi-storey bus depot commissioned by LTA under the Bus Contracting Model (BCM), which sees the Government assuming ownership of all bus assets, including bus depots. East Coast Bus Depot, which commenced construction earlier, is still under construction.

When operations commence in early 2025, Sengkang West Bus Depot will be the first in Singapore to support the large-scale deployment of electric buses. It can accommodate a fleet of around 500 electric and diesel/hybrid buses, and is equipped with facilities such as:

  • Parking spaces, with 360 kW EV chargers
  • Refuelling and washing facilities
  • Repair and maintenance facilities
  • Administrative offices to support day-to-day bus operations
  • Operations Control Centre
  • Staff canteen
  • Bus Captain Lounge
Construction and Planning

The location of Sengkang West Bus Depot was confirmed in April 2017 through the approval of changes to the URA Masterplan 2014. The depot is situated at the junction of Seletar West Road 1 and Seletar West Road 2.

Contract DE133 for the Design and Construction of Sengkang West Bus Depot was published on 3 May 2018. On 25 Jun 2019, the contract was awarded to Santarli Construction Pte Ltd–Zheng Keng Engineering & Construction Pte Ltd Joint Venture at a sum of SGD 202.12 million.

As part of the Ministry of Transport’s Financial Year 2019 Expenditure Estimates, an item for “Independent Multi-Storey Bus Depot-cum-Dormitory at Sengkang West” was listed, indicating an attached dormitory at Sengkang West Bus Depot. In response to a media query by Lianhe Zaobao in March 2019, an LTA spokesperson confirmed this, stating that a dormitory for Bus Captains would be built as part of the Sengkang West Bus Depot project, to maximise land use and reduce travelling time for Bus Captains commuting to and from the Bus Depot.

Due to the COVID-19 pandemic and associated delays, the completion of Sengkang West Bus Depot was delayed from 2023 to 2024. This was announced by Minister for Transport Ong Ye Kung in a written reply to a Parliamentary Question posed in October 2020.

Sengkang West Bus Depot was initially designed to accommodate around 600 buses, according to a Lianhe Zaobao article in 2019. The final figure was revised down to around 500 buses in October 2024, as per LTA’s press release. No reasons have been given for the reduced bus capacity, but the depot-wide installation of EV chargers could have been a factor.

Bus Captain Dormitory block

The eight-storey on-site staff quarters provide accommodation for transport workers, including bus captains. The block comprises 39 apartment units that can accommodate up to 350 beds. Each apartment has ensuite toilets, a kitchen, and a yard. Staff will also have access to recreational facilities such as a TV room and a multi-purpose hall within the premises.

The dormitory block has a separate entrance from the Bus Depot, and is connected to the Bus Depot building via internal access gates.

Charging Infrastructure

EV chargers were installed at Sengkang West Bus Depot to support LTA’s rapid bus electrification goals. 1 in 2 public buses will be electric by 2030, and LTA expects to procure more than 2,000 electric buses by 2029.

From December 2024, the depot’s charging infrastructure will be used to support the deployment of 10 BYD BC12A04 electric buses. These buses are part of an order for 420 new 3-door electric single-deck buses procured by LTA in November 2023.

The chargers at this depot were installed under Contract BD401A, awarded to a Busways Pte Ltd/Shell Singapore Pte Ltd consortium. 240 dual-gun CCS2 DC chargers were installed at Sengkang West Bus Depot, with each pile rated at 360 kW. With dual-gun charging, each charging pile allows for single-deck buses to be fully charged in less than 1.5 hours.

Bus Operations

The completed bus depot was handed over by LTA to SBS Transit in August 2024 for outfitting works, in preparation for bus depot operations to begin in early 2025.

An official handover ceremony was held on 23 October 2024, attended by Minister of State for Transport, Murali Pillai, and representatives from LTA and SBS Transit.

Operations for the Sengkang–Hougang Bus Package will likely be moved from the existing Hougang Bus Depot to the new Sengkang West Bus Depot. According to the LTA, the new 3-door single-deck electric buses will be deployed on bus services 86, 107, and 159, which are part of the Sengkang–Hougang Bus Package.

Come January 2025, Sengkang West Bus Depot could also be absorbing a portion of bus operations from Ang Mo Kio Bus Depot (as part of the Bishan-Toa Payoh Bus Package), which is slated for demolition.

Based on an October 2024 job posting by SBS Transit recruiting for a Human Resource Officer, the role would be “based at Ang Mo Kio Depot until the end of December 2024. After that, it will be split between two locations: Braddell Headquarters and Sengkang West Bus Depot.”

Operational History:
  • Aug 2024 – Present: SBS Transit Ltd

Gallery:
Construction Progress:
Gallery (Artists Impression / Planning)

External Links & References:

See Also:

31 thoughts on “Sengkang West Bus Depot

  • 19 June 2024 at 9:37 AM
    Permalink

    Forget about Go Ahead or what,I got a feeling LTA will extend the contract to SBST for another 2 years..

    Reply
  • 8 January 2024 at 5:22 PM
    Permalink

    Sengkang West Bus Package Should be Operated by Tower Transit since it’s operative in the North Region

    And Certain Services like 80, 87 should be removed from the Package and go to there new packages with new services
    80 to Bukit Merah Package under SBST (Can Amend to loop at Sims Place from HarbourFront, There is MRT from City to Hougang and Sengkang Already and other bus services from Paya Lebar/Geylang East)
    87 to Bedok Package under SBST (Can possibly extend to Punggol North in the Future)
    And Services 854, 854e & 965 can add to the Package since they serve Sengkang and Nearby

    Service 83 can extend to Buangkok INT since there is already a lot of services that take Sengkang-Punggol Route

    Reply
  • 12 September 2021 at 12:58 PM
    Permalink

    High chance that Go-Ahead will win SK-Hougang package and base its ops from this depot.

    Reply
    • 20 June 2022 at 11:35 AM
      Permalink

      Most probably,But they will lose out Loyang to SMRT but bag CCK in 2023.

      Reply
    • 2 September 2023 at 4:45 AM
      Permalink

      What about svc 51 & 151?More dead mileage incurred unless GA ask permission to park a few buses from those svc @ UP.I rather LTA award CCK to GA.Few of svc 61 & 67 can park at LY.

      Reply
  • 30 November 2020 at 8:46 PM
    Permalink

    If GAS win SKG-HGN in 2023,Then the SGN-EUN buses will park at former SMRT Amdep and SBST Amdep until Kim Chuan depot is completed in 2025.

    Reply
  • 11 October 2020 at 5:51 PM
    Permalink

    Strong feelings that GAS will win Sengkang-Hougang package

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *