Tower Transit Bus Service 870 is a trunk service operating from Jurong Town Hall Bus Interchange and loops at Tengah Boulevard in Tengah new town, serving the new housing estates of Plantation Acres and Plantation Village as well as existing housing estates in Bukit Batok West.
Service 870 was extended to serve Tengah Boulevard (Blk 231B) from 24 Dec 2023
↺ Tengah Boulevard (Loop)
Route Overview | ||||||||||||
Route | Jurong Town Hall Bus Interchange ↺ Tengah Boulevard (Loop) | |||||||||||
Passes Through | Jurong East Ctrl, Bt Batok Ave 1, Bt Batok West Ave 6, Bt Batok West Ave 3, Plantation Cres | |||||||||||
Route Length | 11.7 km | |||||||||||
Travelling Time | 50 mins | |||||||||||
Operator Information | ||||||||||||
BCM Route Package | Bulim Bus Package | |||||||||||
Current Operator | Tower Transit Singapore Pte Ltd (Tower Transit Singapore) |
|||||||||||
Current Depot | Bulim Bus Depot | |||||||||||
Current Fleet | Single-deck & Double-deck buses | |||||||||||
Operating Hours | ||||||||||||
Departure Times from Jurong Town Hall |
Daily | |||||||||||
06:00 – 23:15 | ||||||||||||
After 23:15 – 00:45 daily, buses operate as Service 870A, terminating at Tengah Blvd (Blk 231B) |
||||||||||||
Operating Frequency | ||||||||||||
6:30am–8.30am | 8.31am–4.59pm | 5.00pm–7.00pm | After 7.00pm | |||||||||
Loop Service |
10 mins | 12 mins | 10 – 12 mins | 10 – 15 mins | ||||||||
Fare Information |
||||||||||||
Fare | Charges regular distance fares |
Bus Service 870 serves new housing estates in Tengah as well as existing housing estates in Bukit Batok West with direct links to Jurong East, as well as other amenities along its route.
Introduced on Sunday, 26 November 2023, the route is one of the first few services to serve the new Jurong Town Hall Bus Interchange at launch.
Initial Announcement
Plans for the introduction of Bus Service 870 first emerged in October 2023, as mentioned within LTA Travel Guides outlining transportation options for residents of HDB Plantation Village. The guide also highlighted several amenities that Service 870 will serve such as Bukit Batok Swimming Complex and Bukit Batok Blk 156 Market.
As a designated Transit Priority Corridor, Tengah Link will be designated solely for buses from 27 December 2023 (as per signage along Tengah Link). In the interim period from 27 August 2023, other motorists can also use Tengah Link via the left-in-left-out entrance and exit to Bukit Batok Road.
An article from The Straits Times regarding the new bus service in Tengah based on the Facebook Post by Dr Amy Khor mentioned that Tower Transit would be operating this bus service.
December 2023 Extension
On 1 November 2023, the routing and launch date for Service 870 was revealed in a Facebook Post by local Member of Parliament Dr. Amy Khor.
In addition, the post also highlighted plans for the route extension of Service 870 in December 2023 to serve future Bus Stop 40391 along Tengah Boulevard for Plantation Village estate and a non-stop sector along Tengah Drive.
This was later announced to take effect from 24 December 2023. Service 870 will also be further extended with the completion of new roads and housing developments within Tengah New Town.
MRT Station Served
- EW24NS1 Jurong East
Special Departures:
- Plantation Cres (Blk 111) → Jurong Town Hall Int
Daily: 06:05
Short Trip Service:
- Service 870A: Jurong Town Hall Int → Tengah Blvd (Blk 231B)
Daily: 23:30 – 00:45
Gallery (Buses):
Poster & Misc Gallery
Operator History:
- 26 Nov 2023 – Present: Tower Transit Singapore Pte Ltd
The Bus Service Operating License (BSOL) for this route will be renewed in 2026 under the Bulim Bus Package.
Route History:
- 2023 (26 Nov): Introduced between Jurong Town Hall Int and Plantation Cres (Loop)
- 2023 (24 Dec): Extended to loop at Tengah Blvd via Tengah Dr and a section of Bukit Batok Rd
I saw citaro on 870