Shuttle 8 is a Rail Replacement Service for the East West Line (EWL), plying between Bedok – Expo.
The route will be activated to operate in November & December 2025, as EWL train services are suspended for 10 days between Tampines – Bedok & Tanah Merah – Expo for a series of works to facilitate the integration of the EWL to the new East Coast Integrated Depot (ECID), as well as to operationalise the new train platform at Tanah Merah.
The Shuttle Bus Service serves the following MRT Stations:
- EW5 Bedok
- EW4CG Tanah Merah
- CG1DT35 Expo
| Route Overview | ||||||||||||
| Route |
Bedok MRT ↔ Expo MRT | |||||||||||
| Passes Through |
Tanah Merah MRT Station | |||||||||||
| Operator Information | ||||||||||||
| Operator | SMRT Buses Ltd |
|||||||||||
| Fleet | Double-deck buses | |||||||||||
| Operating Hours | ||||||||||||
| Departure Times from Bedok |
Affected Weekdays & Saturdays (29 Nov 2025 – 8 Dec 2025) |
Affected Sundays (30 Nov 2025 & 7 Dec 2025) |
||||||||||
| 05:02 – 00:35 | 05:29 – 00:35 | |||||||||||
| Departure Times from Expo |
Affected Weekdays & Saturdays (29 Nov 2025 – 8 Dec 2025) |
Affected Sundays (30 Nov 2025 & 7 Dec 2025) |
||||||||||
| 05:19 – 00:16 | 05:45 – 00:16 | |||||||||||
| Operating Frequency | ||||||||||||
| Affected Days | 8 – 10 mins | |||||||||||
| Fare Information |
||||||||||||
| Fare | Charges distance fares based on the distance between MRT Stations by rail | |||||||||||
The Shuttle Bus Service operates on days of Full Closure between Tampines – Bedok & Tanah Merah – Expo on the EWL in November 2025 & December 2025, namely:
- Saturday 29 November 2025
- Sunday 30 November 2025
- Monday 1 December 2025
- Tuesday 2 December 2025
- Wednesday 3 December 2025
- Thursday 4 December 2025
- Friday 5 December 2025
- Saturday 6 December 2025
- Sunday 7 December 2025
- Monday 8 December 2025
Operator Posters
Shuttle Bus Boarding Points at Stations
Shuttle Bus Transfer at Tanah Merah
- Shuttle 7: Bedok—Tampines
Towards Tampines –
Pick Up / Drop Off Point outside Tanah Merah Stn Exit B, New Upp Changi Rd
History of Activation
| Shuttle 8 Activation: | |
| January & February 2018 (ECLO+SC) | Tanah Merah—Changi Airport (TTS & GAS) |
| March & April 2018 (ECLO+EEC) | Tanah Merah—Changi Airport (GAS & Private Bus Operators – Rui Feng Chartered & Aedge Holdings) |
| November & December 2025 (FC) | Bedok—Expo (SMRT) |
- EC: Early Closure | LO: Late Opening | EEC: Extended Early Closure | SC: Sunday Closure | FC: Full Closure
Bus Fares:
Charges regular distance fare based on the distance between MRT Stations by rail. Train, bus and hybrid concession passes are accepted, and distance fare rules apply.
Other Rail Replacement Services
The route is one of two Shuttle Bus Services operating during periods of planned closure in November & December 2025, the other route being:
Gallery
History:
- 2017 (15 Dec): Route announced by SMRT Corporation between Expo and Changi Airport
- 2017 (29 Dec): Route extended to Tanah Merah
- 2018 (04 Jan): Drop off point at Tanah Merah amended to Pick Up & Drop Off Point before BS 85099 from Bus Stop 85099 Tanah Merah Stn Exit A
- 2018 (05 Jan): Launched as a Shuttle Bus Service between Tanah Merah and Changi Airport, operating during periods of MRT closure
- 2018 (19 Jan): Extended to operate on 2, 3 & 4 February due to additional days of shortened operating hours on the East West Line
- 2018 (02 Mar): Start of operations for March 2018 MRT Early Closure, Late Opening with revised operating details. Operated by Private Buses
- 2018 (22 Mar): Extended operating days to Fridays, Saturdays & Sundays in April 2018. Frequency reduced to 4 – 10 mins from 3 – 5 mins
- 2025 (03 Oct): Route announced for 10 day closure in November & December 2025 between Bedok and Expo
External Links & References:
- Train Service Adjustments on the East-West Line – Land Transport Authority [Accessed 3 Oct 2025]
- Joint News Release by the Land Transport Authority (LTA) & SMRT – Train Service Adjustments Along East-West Line from 29 November to 8 December 2025 to Facilitate Track Connection to the East Coast Integrated Depot and Operationalise New Platform at Tanah Merah MRT Station – Land Transport Authority [Accessed 3 Oct 2025]
- Service Announcement – Operations of Shuttle 7 and 8 during Train Service Adjustments along East-West Line – SMRT Corporation [Accessed 25 Nov 2025]
Page 2: More Photos
Page 3: Shuttle 8 (Mar & Apr 2018) Route Information
Page 4: Shuttle 8 (Jan 2018) Route Information







Tanah Merah to Expo leh? Must expect the general public who don’t know a thing about buses to either take the long way transfer via DTL3, or take buses 12 / 24 / 35 / 38 / 47 and then brave the unsheltered path all the way to the atrium? Or even direct them to Simei to board bus 20? Ridiculous oversight.
If shuttle 8 goes from changi airport to expo how will passenger go tanah merah to change to shuttle 7.do they need to take the downtown line to tampines or what.