Loading Events

« All Events

  • This event has passed.

Sengkang LRT Maintenance Works (August 2019)

18 August 2019 @ 5:30 AM - 5:30 PM UTC+8

Sengkang LRT Stock Photo
Maintenance works on Sengkang LRT | Sunday, 18th August 2019
Train Service Operates: East Loop West Loop
Before 1730hrs Inner Loop (via SE5 Ranggung) Outer Loop (via SW8 Renjong)
After 1730hrs Both Directions Both Directions

To facilitate asset renewal and maintenance works on the Sengkang LRT network, Train Services will only commence at 5:30 pm on Sunday, 18 August 2019 for the following LRT Services:

  • Sengkang West LRT  via SW1 Cheng Lim
    (West Loop Inner / Route B)
  • Sengkang East LRT  via SE1 Compassvale
    (East Loop Outer / Route C)

Sengkang LRT Services will only operate via:

  • SW8 Renjong on the West Loop
    (West Loop Outer / Route A)
  • SE5 Ranggung on the East Loop  and;
    (East Loop Inner / Route D)

until 5:30 pm, when normal LRT services resume on both loops.

Main Article: Sengkang LRT Maintenance Works (June – October 2019)


Operator Poster

 

Details

Date:
18 August 2019
Time:
5:30 AM - 5:30 PM UTC+8
Event Category:

Leave a Reply

Your email address will not be published. Required fields are marked *