- This event has passed.
Sengkang LRT Maintenance Works (October 2019)
13 October 2019 @ 5:30 AM - 5:30 PM UTC+8
Maintenance works on Sengkang LRT | Sunday, 13th October 2019 | ||
Train Service Operates: | East Loop | West Loop |
Before 1730hrs | Inner Loop (via SE5 Ranggung) | Outer Loop (via SW8 Renjong) |
After 1730hrs | Both Directions | Both Directions |
To facilitate asset renewal and maintenance works on the Sengkang LRT network, Train Services will only commence at 5:30 pm on Sunday, 13 October 2019 for the following LRT Services:
- Sengkang West LRT via SW1 Cheng Lim
(West Loop Inner / Route B) - Sengkang East LRT via SE1 Compassvale
(East Loop Outer / Route C)
Sengkang LRT Services will only operate via:
- SW8 Renjong on the West Loop
(West Loop Outer / Route A) - SE5 Ranggung on the East Loop and;
(East Loop Inner / Route D)
until 5:30 pm, when normal LRT services resume on both loops.
Main Article: Sengkang LRT Maintenance Works (June – October 2019)
Operator Poster