Loading Events

« All Events

Sengkang LRT Maintenance Works (30 Aug)

August 30 @ 5:00 AM - 5:00 PM UTC+8

Sengkang MRT/LRT Station - SKLRT Platform level
Maintenance works on Sengkang LRT
Sunday, 30th August 2020
Train Service Operates: East Loop West Loop
Before 1700hrs Outer Loop (via SE1 Compassvale) Inner Loop (via SW1 Cheng Lim)
After 1700hrs Both Directions Both Directions

To facilitate extended engineering hours for maintenance works on the LRT guideways, Train Services will only commence at 5:00 pm on Sunday, 30 August 2020 for the following LRT Services (from Sengkang Town Centre station):

  • Sengkang West LRT  via SW8 Renjong
    (West Loop Outer / Route A)
  • Sengkang East LRT via SE5 Ranggung
    (East Loop Inner / Route D)

Sengkang LRT Service will only operate via (from Sengkang Town Centre station):

  • SW1 Cheng Lim on the West Loop  and;
    (West Loop Inner / Route B)
  • SE1 Compassvale on the East Loop
    (East Loop Outer / Route C)

until 5:00 pm, when normal LRT services resume on both loops.

Main Article: Sengkang & Punggol LRT Maintenance Works (July – September 2020)


Operator Poster

Details

Date:
August 30
Time:
5:00 AM - 5:00 PM UTC+8
Event Categories:
,

Leave a Reply

Your email address will not be published. Required fields are marked *