SBS Transit Bus Service 158 is a trunk route running from Serangoon Interchange and looping at Rhu Cross, going via Serangoon Avenue 1, Upper Paya Lebar, MacPherson Estate, Aljunied, Mountbatten and Tanjong Rhu Road.
158
S'Goon Int
↺ Rhu Cross (Loop)
↺ Rhu Cross (Loop)
Route Overview | ||||||||||||
Route | Serangoon Bus Interchange ↺ Rhu Cross (Loop) | |||||||||||
Passes Through | Serangoon Ave 1, Bartley Rd, Upp Paya Lebar Rd, Circuit Rd, Aljunied Rd, Mountbatten Rd, Tanjong Rhu Rd | |||||||||||
Route Length | 25.8 km | |||||||||||
Travelling Time | 85 mins | |||||||||||
Operator Information | ||||||||||||
BCM Route Package | Serangoon–Eunos Bus Package | |||||||||||
Current Operator | SBS Transit Ltd | |||||||||||
Current Depot | Hougang Bus Depot (HGDEP) | |||||||||||
Current Fleet | Single-deck buses | |||||||||||
Operating Hours | ||||||||||||
Departure Times from Serangoon |
Weekdays & Saturdays |
Sundays / Public Holidays |
||||||||||
05:45 – 23:30 | 06:00 – 23:30 | |||||||||||
Operating Frequency | ||||||||||||
Loop Service | 6:30am–8.30am | 8.31am–4.59pm | 5.00pm–7.00pm | After 7.00pm | ||||||||
Weekdays | 11 – 15 mins | 12 – 17 mins | 13 – 15 mins | 17 – 24 mins | ||||||||
Saturdays | 16 – 17 mins | 14 – 17 mins | 17 – 19 mins | 17 – 24 mins | ||||||||
Sundays / Public Holidays | 18 – 20 mins | 16 – 19 mins | 19 mins | 19 – 25 mins | ||||||||
Fare Information |
||||||||||||
Fare | Charges regular distance fares |
Service 158 is a residential trunk route connecting the estates of Serangoon, Bartley, MacPherson, Geylang, Mountbatten and Tanjong Rhu, linking them with a multiple MRT stations along the way, such as Serangoon, Tai Seng and Aljunied. The route is well utilized not just by residents, but also by workers from industrial areas near Tai Seng and Aljunied Road.
MRT Stations Served
- NE12CC13 Serangoon
- CC12 Bartley
- CC11 Tai Seng
- CC10DT26 MacPherson
- DT25 Mattar
- EW9 Aljunied
- CC7 Mountbatten
- TE24 Katong Park
- TE23Â Tanjong Rhu
Special Departures
- Rhu Cross (Opp Costa Rhu Condo) → Serangoon Int
Weekdays: 06:00 & 06:16
Saturdays: 06:00 & 06:11
Sundays / Public Holidays: 06:15
Short Trip Service
- Service 158A: Aljunied Rd (Aljunied Stn) → Aljunied Rd (Opp Aljunied Stn) via Rhu Cross
Weekdays: 06:34 – 08:28 - Service 158A (Special Departures): Tanjong Rhu Rd (Dunman High Sch) → Aljunied Rd (Opp Aljunied Stn)
Weekdays: 14:21, 15:05 & 15:36
Gallery
Poster Gallery
Operator History
- 1971 – 1973: Associated Bus Service
- 1973 – 2001: Singapore Bus Services Ltd
- 2001 – Present: SBS Transit Ltd
The Bus Service Operating License (BSOL) for this route will be renewed in 2025 under the Serangoon–Eunos Bus Package.
History
- 1971 (08 Aug): Introduced between Toa Payoh Town Ctr Ter and Fidelio St Ter
- 1973 (01 Jul):Â Extended to Chai Chee Ter
- 1974 (03 Feb): Amended to skip Fidelio St under 1974 Bus Rationalisation
- 1983 (26 Dec): Amended to Toa Payoh Int
- 1985 (08 Sep): Extended to Bedok Int with the closure of Chai Chee Ter
- 1990 (04 Feb): Amended to Serangoon Int
- 1992 (03 May): Shortened to loop at Tg Rhu Rd under TransitLink Network Integration Exercise Phase 7
- 1998:Â Calls at a new bus stop opposite Costa Rhu Condo along Rhu Cross, skipping a pair of bus stops outside and opposite AMCOL along Tg Rhu Rd
- 2003:Â Skips a pair of bus stops outside and opposite Camelot Condo along Tg Rhu Rd to facilitate the construction of KPE
- 2004 (27 Apr): Amended to ply Geylang Rd, Kallang Rd and Sims Ave towards Serangoon Int with the temporary conversion of Lor 1 Geylang to one-way traffic
- 2004: Serves additional pair of bus stops outside S’goon Stn along Serangoon Central
- 2004 (06 Dec): Amended to ply the reinstated Lor 1 Geylang towards Serangoon Int, skipping Geylang Rd, Kallang Rd and Sims Ave
- 2005 (05 Jun): Amended to ply Sims Way with the partial closure of southbound Mountbatten Rd
- 2005 (02 Jul): Amended to ply Sims Way with the partial closure of northbound Mountbatten Rd
- 2009 (08 Mar):Â Skips a pair of bus stops outside and opposite Bartley Sec Sch with the realignment of the junction of Upp Paya Lebar Rd and Bartley Rd
- 2009 (22 Nov): Serves new pair of bus stops outside and opposite MacPherson Stn along Circuit Link
- 2011 (26 Jun): Amended to ply Lor Bengkok with the closure of Circuit Link to facilitate the construction of MacPherson MRT station on the Downtown MRT Line
- 2011 (03 Sep): Amended to Serangoon Integrated Transport Hub
- 2013 (31 Mar): Designated wheelchair-accessible bus service (WAB)
- 2014 (10 Aug): Serves new bus stop opposite Blk 2 along Mountbatten Rd
- 2016 (16 Oct): Amended to ply the reinstated Circuit Link, skipping Lor Bengkok
- 2024 (28 Apr): Serves a pair of new bus stops outside Tanjong Rhu MRT Station Exit 1 & 2 along Tanjong Rhu Rd
Back to Bus Services
Back to Bus Articles