| CC30 Keppel 吉宝 | கெப்பல் |
|
![]() |
|
| Address | 51 Keppel Road, Singapore 099423 |
| Line Served | Circle Line |
| Operator | SMRT Trains |
| Structure | Underground |
| Platform | Island |
| Opening | 12 Jul 2026 |
Keppel MRT Station (CC30) is a 20 meter deep underground station located along the Circle Line (CCL) Stage 6. It is built just off Keppel Road, bringing rail connectivity to both Keppel Distripark and future developments in the Keppel area.
The station is named after the nearby Keppel Harbour, named after Captain Henry Keppel who discovered the sheltered, deep water harbour. The Keppel Port area east of the station is planned to be redeveloped after 2030, once the container port is fully moved to Tuas Port. The future Greater Southern Waterfront region currently under planning will provide more options for city living.
The station will open for passenger service on 12 July 2026.
First / Last Train Timings
| Circle Line – (CC30) Keppel |
|||
| Destination | First Train | Last Train | |
| Weekdays & Sat | Sun & Public Holidays | Daily | |
| — | — | — | — |
| — | — | — | — |
Station Layout
| L1 | Street level | Bus stops, Taxi stand, pick-up/drop-off point |
| B1 | Concourse | Faregates, Ticketing Service Kiosks, Passenger Service Centre, Bicycle Parking |
| B2 | Platform A | Circle Line (Anticlockwise ↺) via CC33NS27TE20 Marina Bay |
| Platform B | Circle Line (Clockwise ↻) via CC29NE1 HarbourFront |
Platforms & Train Services
| Platform A: Circle Line (Anticlockwise ↺) via CC31 Cantonment & CC33NS27TE20 Marina Bay (→) Platform B: Circle Line (Clockwise ↻) via CC29NE1 HarbourFront (←) |
Keppel station has two platforms in an island platform arrangement.
Refer to the Station Travel Information System (STIS) for the destination and service information of upcoming trains.
Hidden from the platform, a pair of cripple sidings are located parallel to the running tracks, separated by a concrete wall.
Underground Bicycle Parking
An underground bicycle parking space will be provided as part of Keppel MRT Station.
Exits
Keppel MRT station has 3 exits leading to ground level.
The passageway between Exits 1 & 2 serves as a 24-hour underpass.
| Exit | Location | Nearby |
| 1 | Keppel Road (Westbound) | — |
| 2 | Keppel Road (Eastbound) | — |
| 3 | Keppel Road (Westbound) | — |
Transport Connections
Keppel station connects to several bus stops in the vicinity, as well as taxi stands and passenger pick-up points.
Bus
There are 2 bus stops in the vicinity of Keppel station.
| Bus Stop | Exit | Bus Routes |
| Tg Pagar DP Blk F5 (14081) Keppel Rd |
3 | 10, 30, 57, 80, 97, 100, 131, 145 |
| Opp Tg Pagar DP Blk F5 (14089) Keppel Rd |
2 | 10, 30, 57, 80, 97, 100, 131, 145 |
Road
Taxi stands and pick-up/drop-off points are located near station exits.
| Exit | Road | Provisions |
| 1 | Keppel Road | Taxi stand, Pick-up/drop-off point |
| 2 | Keppel Road | Taxi stand, Pick-up/drop-off point |
Construction
Circle Line Stage 6 (CCL6) Contract 882 for the Construction of Keppel Station and Tunnels for Circle Line 6 was awarded to China State Construction Engineering Corporation Limited (Singapore Branch) – Nishimatsu Construction Co., Ltd. Joint Venture on 8 September 2017 at a contract sum of S$313.8 million.
Originally planned to commence service in 2025, the opening was delayed by a year due to delays resulting from the COVID-19 situation.

Alternative route to Marina Bay when Train is only Terminating at Dhoby Ghaut:
Firstly:Take the CCL to Dhoby Ghaut and Lastly,Take The NSL To Marina Bay and done!
Correction:
4:Keppel Distripark
10 NE2 station Name suggestions:
1:Kampong Bahru
2:Keppel West
3:Northwestern Keppel
4:Keppel North
5:Tanjong Pagar Terminal
6:Northeastern HarbourFront
7:HabourFront East
8:Northeastern Outram Park
9:Outram Park East
10:Greater Northern Waterfront
2 reply,Type the number of the NE2 names above