Keppel MRT Station

CC30
Keppel
吉宝 | கெப்பல்
Keppel MRT Station Locality Map (Jul 2026)
Address 51 Keppel Road, Singapore 099423
Line Served   Circle Line
Operator SMRT Trains
Structure Underground
Platform Island
Opened 12 Jul 2026

Keppel MRT Station (CC30) is a 20 meter deep underground station located along the Circle Line (CCL) Stage 6. It is built just off Keppel Road, bringing rail connectivity to both Keppel Distripark and future developments in the Keppel area.

The station is named after the nearby Keppel Harbour, named after Captain Henry Keppel who discovered the sheltered, deep water harbour. The Keppel Port area east of the station is planned to be redeveloped after 2030, once the container port is fully moved to Tuas Port. The future Greater Southern Waterfront region currently under planning will provide more options for city living.


First / Last Train Timings
Circle Line – (CC30) Keppel
Destination First Train Last Train
Weekdays & Sat Sun & Public Holidays Daily
Anticlockwise Loop 5:49am 6:14am 11:53pm^
^ Note: Last Anticlockwise Loop train ends at CC17 Caldecott
Clockwise Loop 6:05am 6:30am 10:44pm
CC33 Marina Bay 10:57pm
CC7 Mountbatten 11:37pm
CC12 Bartley 11:59pm

Station Layout
L1 Street level Bus stops, Taxi stand, pick-up/drop-off point
B1 Bicycle Park Underground Bicycle Parking Facility , Bicycle Kiosk
Concourse Faregates, Ticketing Service Kiosks, Passenger Service Centre, Retail Shop Provisions
B2 Platform A Circle Line (Anticlockwise ↺) via CC33NS27TE20 Marina Bay
Platform B Circle Line (Clockwise ↻) via CC29NE1 HarbourFront
Platforms & Train Services
Platform A: Circle Line (Anticlockwise ↺) via CC31 Cantonment & CC33NS27TE20 Marina Bay (→)
Platform B: Circle Line (Clockwise ↻) via CC29NE1 HarbourFront (←)

Keppel station has two platforms in an island platform arrangement.

Refer to the Station Travel Information System (STIS) for the destination and service information of upcoming trains.

Hidden from the platform, a pair of cripple sidings are located parallel to the running tracks, separated by a concrete wall.

Underground Bicycle Parking Facility

Keppel station has an underground bicycle parking facility, with 312 bicycle lots. A bicycle kiosk (provisional space) is also available in the facility.

Access to the facility is via dedicated lifts near Exit 1 at Level 1, or the corridor towards Exit 1 at Concourse level (Level B1).


Station Amenities
  • Public Toilets at station concourse (B1)
  • Retail Shop provisions
  • Bicycle Racks at station exits
Exits

Keppel MRT station has 3 exits leading to ground level. The passageway between Exits 1 & 2 serves as a 24-hour underpass.

Additional exits to the north of the station are provisioned in the future through knock-out panels.

Exit Location Nearby
1 Keppel Road
(Westbound)
2 Keppel Road
(Eastbound)
Church of St Teresa, Keppel Distripark
3 Keppel Road
(Westbound)

Transport Connections

Keppel station connects to several bus stops in the vicinity, as well as taxi stands and passenger pick-up points.

Bus

There are 2 bus stops in the vicinity of Keppel station.

Bus Stop Exit Bus Routes
Keppel Stn Exit 3
(14081) Keppel Rd
3 10, 30, 57, 80, 97, 100, 131, 145
Keppel Stn Exit 2
(14089) Keppel Rd
2 10, 30, 57, 80, 97, 100, 131, 145
Road

Taxi stands and pick-up/drop-off points are located near station exits.

Exit Road Provisions
1 Keppel Road (Westbound) Taxi stand (E41), Pick-up/drop-off point
2 Keppel Road (Eastbound) Taxi stand (E42), Pick-up/drop-off point

MRT Bus Bridging Service

In the event of a MRT service disruption affecting Keppel station, MRT Bridging Buses may be activated to ply affected stretches of the Circle Line. In which case, the buses can be boarded from the following bus stops:

Towards Bus Stop Exit
Circle Line (CCL Bridging Bus)
Clockwise via
CC29NE1 HarbourFront
Keppel Stn Exit 3
(14081) Keppel Rd
3
Anticlockwise via
CC33NS27TE20 Marina Bay
Keppel Stn Exit 2
(14089) Keppel Rd
2

In addition, passengers can board free regular bus services at Bus Stops 14081 & 14089 when activated.


Construction

Circle Line Stage 6 (CCL6) Contract 882 for the Construction of Keppel Station and Tunnels for Circle Line 6 was awarded to China State Construction Engineering Corporation Limited (Singapore Branch) – Nishimatsu Construction Co., Ltd. Joint Venture on 8 September 2017 at a contract sum of S$313.8 million.

Originally planned to commence service in 2025, the opening was delayed by a year due to delays resulting from the COVID-19 situation.


Gallery

External Links & References

13 thoughts on “Keppel MRT Station

  • 17 May 2026 at 9:25 AM
    Permalink

    Alternative route to Marina Bay when Train is only Terminating at Dhoby Ghaut:
    Firstly:Take the CCL to Dhoby Ghaut and Lastly,Take The NSL To Marina Bay and done!

    Reply
  • 17 May 2026 at 9:20 AM
    Permalink

    Correction:
    4:Keppel Distripark

    Reply
  • 17 May 2026 at 9:17 AM
    Permalink

    10 NE2 station Name suggestions:
    1:Kampong Bahru
    2:Keppel West
    3:Northwestern Keppel
    4:Keppel North
    5:Tanjong Pagar Terminal
    6:Northeastern HarbourFront
    7:HabourFront East
    8:Northeastern Outram Park
    9:Outram Park East
    10:Greater Northern Waterfront

    2 reply,Type the number of the NE2 names above

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *