SBS Transit Bus Service 860

Gallery: (SMRT Buses)

Ding Dong Bell

Ding Dong!

6 thoughts on “SBS Transit Bus Service 860

  • 19 December 2017 at 7:06 AM
    Permalink

    The bus is driving at extremely slow pace and stopping at every stop when there are no passengers. It’s definitely frustrating when it comes to peak hours when everyone is rushing for work and the bus captain needs to drag the bus to meet the timing and waste commuters time. Can the bus just drive at a normal pace?

    Reply
  • 10 November 2017 at 2:24 PM
    Permalink

    Why does Bus 860 travel so slowly? It move like a tortoise crawling. The driver will stop at every bus stop even there is no passenger alighting or boarding. It took 40 mins from Khatib camp to Yio Chu Kang Interchange. At first i am very happy that there is a straight bus from Khatib to YCK interchange but it is so disappointed.

    Reply
    • 11 November 2017 at 3:45 PM
      Permalink

      The scheduled running time for this bus service is excessive, resulting in Bus Captains driving at a very slow speed.

      Reply
  • 16 September 2017 at 1:25 PM
    Permalink

    Given that 807 will replicate the Yishun Ring Road portion and that 860 will no longer call Khatib MRT, I do not quite understand why the new routing still needs to go through Yishun Ring Road. Would it be better to go via Yishun Central? That way, it will connect Springleaf/Teacher’s Estate directly to KTPH.

    Reply
    • 15 October 2017 at 1:57 PM
      Permalink

      They still need 860 to ply at ring road to ease 807 load on morning peak hours and 860 is still the fastest way to get to khatib mrt station (walk from 846 bus stop) or major supermarket at block 845 inside block 400+ and 300+ cause 804 806 800 still go through 1 big round before reaching northpoint

      Reply
  • 27 June 2016 at 11:45 PM
    Permalink

    An essential link for Yishun Ring Rd neighbourhood 3 & 4 where bus services were seriously lacking. Thanks to BSEP which brought in new routes like 103(extended), 663, 803 & 805. Look forward to more trunk route additions with the completion of several flats at St 51 and Ave 4 which will further increase 860’s current high loading.
    Planners may consider diversion of existing routes from main road.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *