| CR20 | |
| Address | Near Jalan Terusan |
| Line Served | Cross Island Line |
| Operator | (TBC) |
| Structure | Underground |
| Platform | (TBC) |
| Opening | Late 2030s |
CR20 MRT Station is an underground station along the Cross Island Line (CRL) Phase 3. The station is located at Jalan Terusan, with an underpass underneath the Ayer Rajah Expressway (AYE) leading to the Taman Jurong Estate.
The station was announced on 31 July 2026 as part of the Cross Island Line Phase 3. It is targeted for completion and opening in the late 2030s.
Train Services
- Eastbound: Towards CR1TE32 Changi Terminal 5 via CR19 Jurong Lake District
- Westbound: Towards CR23EW30 Gul Circle via CR21JS12 Jurong Pier
The station platforms are built to eight-car length to cater for future expansion, although trains will only operate in a six-car formation.
Station Name
As the LTA no longer reveals station working names to the public, CR20 station is officially referred to only by its alphanumeric code.
Gallery
External Links & References
- Joint News Release by the Land Transport Authority (LTA) & SLA – Cross Island Line Phase 3 to Connect Jurong Lake District to Gul Circle with Four New Stations – Land Transport Authority [31 Jul 2026]
Back to Cross Island Line

The should just call it ‘Sungei Jurong’, as there is a canal near there called Sungei Jurong.
154 might get cut once crl opens
Lol 67 still around leh despite DTL running the full length for nearly a decade now
Predicted name: Taman Jurong or Yuan Ching or Terusan