Buangkok Bus Interchange

Buangkok Integrated Transport Hub (ITH) is an upcoming bus interchange located at Buangkok, currently under construction as part of the Sengkang Grand Mall development. The bus interchange was expected to be operational in Q3 2023, according to the mall’s website.

Details:
Name Buangkok Bus Interchange
Address 11 Sengkang Central, Singapore 544575
BCM Route Package TBC
Anchor Operator TBC
Bus Routes TBC
Berths 7 end-on boarding berths
Rail Connection NE15 Buangkok

 


Brief History

Plans for the interchange were first mooted as part of the Urban Redevelopment Authority (URA)’s 2013 Draft Masterplan. Located in the heart of Buangkok neighbourhood, the interchange will be part of a mixed-use development envisioned as an integrated community hub to meet the needs of some 20,000 residents in Buangkok.

The proposed mixed-use development will have an integrated community and transport hub with a bus interchange on the first storey, a hawker centre on the second storey and a community club that spans across three storeys, alongside childcare centres and retail shops. Located adjacent to Buangkok MRT Station, the development will also be a transport node for the residents of Buangkok.

As the focal point and an identity marker for the Buangkok neighbourhood, the URA prioritized thoughtfully-designed public spaces which were well integrated with transport and community uses. A tender for the development of the land parcel was launched on 28 December 2017, and was awarded to Siena Residential Development Pte. Ltd. and Siena Trustee Pte. Ltd. (as Trustee-Manager of Siena Commercial Trust) at a tender price of S$777.78 million on 16 August 2018.


The Interchange

Based on the floor plans provided as part of the Sengkang Grand Residence development, Buangkok Bus Interchange would feature end-on berths with 19 parking lots.

The main vehicle ingress/egress leads to Sengkang Central, while a backup ingress/egress at the opposite end of the interchange led to Compassvale Bow, via the loading/unloading bay of Sengkang Grand Mall.

Berth Allocation:
Berth Bus Services
B1
B2
B3
B4
B5
B6
B7

 


Gallery (site plans and diagrams):


References

70 thoughts on “Buangkok Bus Interchange

  • 1 December 2023 at 3:39 PM
    Permalink

    Hello it is alr q4 2023 now and its not opened yet !

    Reply
  • 20 August 2023 at 7:01 AM
    Permalink

    Hi, just to share my experience with Boon Lay ITH (2009) and Joo Koon ITH (2015).

    From the time the construction materials are removed, to the opening of the bus interchange, takes around 6 to 12 months.

    Considering the construction materials are still at the Buangkok ITH, I would say, Q3 2024 opening is more likely.

    Reply
    • 23 August 2023 at 12:06 PM
      Permalink

      LMAO CapitaLand says it is expected to be completed in Q3 2023, and passing by the area works are almost done with works starting to remove the centre island where buses are expected to turn out to Baungkok stn exit B bus stop.

      Then we have you the joker who say no Q3 2024. So you mean you know better than a big organisation, that is building the interchange, spreading fake news on their website?

      Please do your research before commenting rubbish.

      Reply
      • 24 August 2023 at 4:53 PM
        Permalink

        Tbh I wouldn’t be surprised if the opening gets delayed for one reason or another, prlly not by an entire year but like — Q3 is ending in one month and LTA still hasn’t said anything about this interchange, would have expected them to make some kind of poster or something about it by now. Then again they could be waiting until like the week before to announce this.

        Reply
      • 3 November 2023 at 8:36 AM
        Permalink

        Aged liked milk lmfao

        Reply
      • 20 January 2024 at 1:52 PM
        Permalink

        Do research? Very funny leh, already 2024 and still not open. At ur comment time have u seen the interchange? Construction material not removed yet ofc ppl say wont open lah.

        Reply
  • 18 August 2023 at 7:31 PM
    Permalink

    When will Buangkok ITH open?

    Reply
    • 23 August 2023 at 12:10 PM
      Permalink

      It is likely to open next month (Sep 2023), just in line with the mall’s website Q3 2023, which is ending on Sep 30. The works are almost completed given they have just started the opening of the center divider.

      But I wont expect any new services for the time being apart from 110 and 114. There are strong indications and rumours that 110 is expected to start from baungkok. No new services as Hougang depot is way overcrowded with over 700 buses, way out of it’s designed capacity, until sengkang west depot opens up.

      Reply
  • 19 July 2023 at 4:59 AM
    Permalink

    I personally think that the following may happen:

    Service 110: I think it would be beneficial for residents staying around Anchorvale to have a direct service to Buangkok MRT and also other amenities found there. The missing sector to Compassvale Int is still covered by 372.

    Service 114/114A: Quite Clear cut, at least drivers don’t have to layover at Compassvale Int anymore or the parking lots near the Buangkok Stn Bus Stop

    Service 156: I chose 156 to be shortened here because based on personal experience, 156 is very under utilised at Sengkang Int. Maybe it could be amended via Compassvale Bow or Sengkang East Ave. The lost sector is already covered by 159, 159A and 161.

    These are just my own personal opinions and predictions. I may be wrong but for now, these seem to be logical.

    Reply
    • 30 July 2023 at 11:27 AM
      Permalink

      Logic..110,114,156 & probably 115 extend here to loop at St 21 instead.Most probably 2 new feeder service.

      Reply
    • 6 January 2024 at 3:00 PM
      Permalink

      Some people use 156 from Sengkang->buangkok green, not all bkok green stops are served by 159 n 161

      Reply

Leave a Reply

Your email address will not be published. Required fields are marked *